Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66,728.65Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹67,749.85+₹1,021.20 (1.53%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹73,977.19+₹7,248.54 (10.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Actual Name of Work Not Mentioned in Bid Correctness |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
17 Jun 2026, 4:00 pmClosed
Executive Engineer PWD RnB Division Banihal
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_311011_10
18 of 2026-27
Open Tender
Civil Works
Percentage
Executive Engineer PWD RnB Division Banihal
Refer to NIT
3 documents required · 3 mandatory
₹200
Executive Engineer PWD RnB Division Banihal
₹2,000
Executive Engineer PWD RnB Division Banihal
9 Jul 2026
26 May 2026
18 Jun 2026
26 May 2026
17 Jun 2026
26 May 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete | 66.59 | sqm | 1,395.1 | ₹92,899.71 |
| 0.0 | Distempering with dry distemper of approved brand and manufacture (one or more coats) and of required shade on old work to give an even shade. | 102.23 | sqm | 52.95 | ₹5,413.08 |
| 0.0 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. | 20.63 | sqm | 86.75 | ₹1,789.65 |
| 0.0 | Carriage of Material by Mechanical Transport including loading, Unloading and Stacking at Site:
a. Sand for an avg lead of 90 Km | 0.01 | cum | 1,182.7 | ₹11.83 |
| 0.0 | Carriage of Material by Manual Labour including loading, unloading and stacking at site:
a. Sand for an avg lead of 100 Mtr | 0.01 | cum | 244.36 | ₹2.44 |
| 0.9 | b. Cement for an avg lead of 100 Mtr | 0.01 | tonne | 133.27 | ₹1.33 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_1006866.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .