| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 CrAdmitted-Finance 00 BHUSAR FARM KE PASS K K PURI NANDANPURA JHANSI UTTAR PRADESH 284003 | JHANSI | UTTAR PRADESH | 284003 | -1.00% | ₹6.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.6 Cr+₹5.0 L (0.76%)Admitted-Finance | -0.25% | ₹6.6 Cr+₹5.0 L (0.76%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical ok |
Tender Value
₹6.7 Cr
EMD Value
₹35.3 L
Closing Date
23 Feb 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
Redevelopment work including green cover by geo capping at capped dumpside Shahdara.
2026_DOLBU_1115125_1
07-02-2026/NAGAR NIGAM AGRA/23-02-2026/01
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹35,400
NAGAR NIGAM
₹35.3 L
16 Mar 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km complete (earth measured in stacks will be reduced by 20% for payment).DSR-2.2 | - | Cum | - | - |
| 2 | Supplying and stacking sludge at site including royalty and carriage upto 5 km complete (sludge measured in stacks will be reduced by 8% for payment)..DSR-2.3 | - | Cum | - | - |
| 3 | Supplying and stacking at site dump manure from approved source,including carriage upto 5 km complete (manure measured in stacks will bereduced by 8% for payment)..DSR-2.4 | - | Cum | - | - |
| 4 | Rough dressing the trenched ground including breaking clods.DSR-2.5 | - | Sqm | - | - |
| 5 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation 2.6 | - | Sqm | - | - |
| 6 | Fine dressing of the ground.DSR 2.8 | - | Sqm | - | - |
| 7 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately) DSR 2.8 | - | Cum | - | - |
| 8 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-chargeDSR 2.10 | - | Sqm | - | - |
| 9 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts.DSR 2.12 | - | Sqm | - | - |
| 10 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after aking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately).DSR 2.13 | - | Cum | - | - |
stage.html
html • 0.03 MB
techsummary_2068770.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.28 MB
BOQ_2068770.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .