| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹567 (0.16%)Admitted-Finance | ₹3.6 L+₹567 (0.16%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 L+₹967 (0.27%)Admitted-Finance | ₹3.6 L+₹967 (0.27%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHARMA ELECTRIC WORKS L3 | SANJAY ELECTRICALS L2 | M/S JITENDRA KUMAR L1 |
|---|---|---|---|---|---|---|
| 1.00Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | ||||||
| 1.01 | PCC/ST poles 8.5/11 Mtr. | 6 | Nos. | 1,200 ₹7,200 | 1,100 ₹6,600 Lowest | 1,200 ₹7,200 |
| 2.00 | Cartage of line material viz Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | 12 | Qtl. | 300 ₹3,600 Lowest | 350 ₹4,200 | 350 ₹4,200 |
| 3.00Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | ||||||
| 3.01 | PCC/ST poles 8.5/11 Mtr. | 4 | Nos. | 1,500 ₹6,000 | 1,100 ₹4,400 Lowest | 1,500 ₹6,000 |
| 4.00Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | ||||||
| 4.01 | PCC/ST poles 8.5/11 Mtr. | 1 | Nos. | 6,000 ₹6,000 | 6,000 ₹6,000 | 5,000 ₹5,000 Lowest |
| 5.00 | (a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. | 8 | Nos. | 700 ₹5,600 | 600 ₹4,800 Lowest | 600 ₹4,800 Lowest |
| 6.00Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | ||||||
| 6.01 | ACSR Weasal Conductor. | 31 | Mtr. | 10 ₹310 | 9 ₹279 | 8 ₹248 Lowest |
Tender Value
₹3.6 L
EMD Value
₹4,000
Closing Date
30 Mar 2026, 12:00 pmClosed
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
EDCA-38/2025-26
2026_DVVNL_1129408_1
EDCA-38/2025-26
Open Tender
Electrical Works
Item Rate
30 days
EDD-ATRAULI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL WEBSITE
₹4,000
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | |||||
| 1.01 | PCC/ST poles 8.5/11 Mtr. | 6 | Nos. | - | - |
| 2 | Cartage of line material viz Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | 12 | Qtl. | - | - |
| 3Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | |||||
| 3.01 | PCC/ST poles 8.5/11 Mtr. | 4 | Nos. | - | - |
| 4Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | |||||
| 4.01 | PCC/ST poles 8.5/11 Mtr. | 1 | Nos. | - | - |
| 5 | (a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. | 8 | Nos. | - | - |
| 6Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | |||||
| 6.01 | ACSR Weasal Conductor. | 31 | Mtr. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Doc38.pdf
Tender Documents • 1.01 MB
BOQ_2106723.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .