Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.5 L (3.87%)Admitted-Finance | ₹1.2 Cr+₹4.5 L (3.87%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹18.5 L (15.8%)Admitted-Finance 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | ₹1.4 Cr+₹18.5 L (15.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹28.6 L (24.5%)Admitted-Finance NULL | ₹1.5 Cr+₹28.6 L (24.5%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not fulfil all Documents as per NIT |
| Sl No | Description | Qty | Unit | P A SALES CORPORATION L3 | M/s Bhagwan singh L4 | M/s PAPPAN ELECTRIC AND GAS WELDING WORKS L1 | R N S BUILDERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (Rate Including G.S.T.). | 1,000 | Sqm | 13.2 ₹13,200 | 13.5 ₹13,500 | 9 ₹9,000 Lowest | 11.79 ₹11,790 |
| 2.00 | Exposing the buried structure including city wall by removal of debries/malwa and shorting out the serviceable stone including stacking the stone at suitable place and removal of malwa up to a lead of 100mtr and hight upto 10mtr. complete. (Rate Including G.S.T.). | 396.25 | Cum | 630 ₹2,49,637.5 | 650 ₹2,57,562.5 | 349 ₹1,38,291.25 Lowest | 563.25 ₹2,23,187.81 |
| 3.00 | R.R. Stone masonry in super structure with 80% new hard stone & 20% old stone at site in composite lime mortar 1:1:1 (1Lime :1 C. Sand :1 Surkhi) mixed with composite materials including supply of all materials labour, scaffolding, T&P etc. required for proper completion of work. (Rate Including G.S.T.). | 1,981.5 | Cum | 4,550 ₹90,15,825 | 5,000 ₹99,07,500 | 4,076 ₹80,76,594 Lowest | 4,084.3 ₹80,93,040.45 |
| 4.00 | C. R. Stone masonry as under pinning in super structure with 95% new hard sand stone and 5% old CR stone available at site in composite lime mortar 1:1:1 (1Lime :1Surkhi :1C.sand) mixed with composite materials including supply of materials labour, scaffolding etc. complete for proper completion of work. (Rate Including G.S.T.). | 541.4 | Cum | 6,040 ₹32,70,056 | 6,000 ₹32,48,400 | 4,786 ₹25,91,140.4 Lowest | 5,406.12 ₹29,26,873.37 |
| 5.00 | Recessed Pointing with 1:1:1 ratio composite lime mortar (1Lime :1 C. sand: 1 Surkhi) mixed with colour pigment including racking out joints etc. and supply of all materials labour, scaffolding, T&P etc required for proper completion of work. (Rate Including G.S.T.). | 1,234 | Sqm | 173 ₹2,13,482 | 250 ₹3,08,500 | 129 ₹1,59,186 Lowest | 153.7 ₹1,89,665.8 |
| 6.00 | Lakhori Bricks masonry up to height of 8mt with 1:1:1 ratio composite lime mortar (1Lime:1C Sand: 1Surkhi) including scaffolding and supply of all materials. (Rate Including G.S.T.). | 47.93 | Cum | 7,370 ₹3,53,244.1 | 7,500 ₹3,59,475 | 6,786 ₹3,25,252.98 | 6,595.79 ₹3,16,136.21 Lowest |
| 7.00 | Providing & laying position lime concrete with graded brick aggregate 20-40 mm gage size and 50% composite lime mortar 1:1:1 ratio (1 lime, 1 Surkhi 1 C.Sand,) mixed with composite materials as in floor and foundation including supply of all materials labour, scaffolding, T. & P. etc required for proper completion of work. (Rate Including G.S.T.). | 40.5 | Cum | 6,909 ₹2,79,814.5 | 7,500 ₹3,03,750 | 6,786 ₹2,74,833 | 6,185.2 ₹2,50,500.6 Lowest |
| 8.00 | Providing 65-75mm average thick simple molded plaster 1:1:1 ratio composite lime mortar (1Lime :1C.Sand :1Surkhi) mixed with composite materials labour T&P etc. required for proper completion work. (Rate Including G.S.T.). | 77.24 | Sqm | 625 ₹48,275 | 625 ₹48,275 | 420 ₹32,440.8 Lowest | 558.51 ₹43,139.31 |
| 9.00 | Supply & fixing red sand stone Slabs/ facing/ dab stone exposed surface fine dress and set in composite lime mortar 1:1:1 (1Lime :1C.Sand :1Surkhi) mixed with composite materials including supply of all materials labour, scaffolding, T&P etc. required for proper completion work. (Rate Including G.S.T.). | 2.7 | Cum | 32,960 ₹88,992 | 35,000 ₹94,500 | 27,786 ₹75,022.2 Lowest | 29,508.03 ₹79,671.68 |
Tender Value
₹1.3 Cr
EMD Value
₹3.2 L
Closing Date
9 Nov 2021, 3:00 pmClosed
Superintending Archaeologist
Office of The Superintending Archaeologist ASI, The 22, Mall Road, Agra Circle
AS PER TENDER DOCUMENT
2021_ASI_652851_1
03/FTS/04/2021-2022/W
Open Tender
Civil Works
Works
300 days
FATEHPUR SIKRI
AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹0
₹3.2 L
Yes
18 Nov 2021
14 Oct 2021
10 Nov 2021
14 Oct 2021
9 Nov 2021
14 Oct 2021
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (Rate Including G.S.T.).
Exposing the buried structure including city wall by removal of debries/malwa and shorting out the serviceable stone including stacking the stone at suitable place and removal of malwa up to a lead of 100mtr and hight upto 10mtr. complete. (Rate Including G.S.T.).
R.R. Stone masonry in super structure with 80% new hard stone & 20% old stone at site in composite lime mortar 1:1:1 (1Lime :1 C. Sand :1 Surkhi) mixed with composite materials including supply of all materials labour, scaffolding, T&P etc. required for proper completion of work. (Rate Including G.S.T.).
C. R. Stone masonry as under pinning in super structure with 95% new hard sand stone and 5% old CR stone available at site in composite lime mortar 1:1:1 (1Lime :1Surkhi :1C.sand) mixed with composite materials including supply of materials labour, scaffolding etc. complete for proper completion of work. (Rate Including G.S.T.).
Recessed Pointing with 1:1:1 ratio composite lime mortar (1Lime :1 C. sand: 1 Surkhi) mixed with colour pigment including racking out joints etc. and supply of all materials labour, scaffolding, T&P etc required for proper completion of work. (Rate Including G.S.T.).
Lakhori Bricks masonry up to height of 8mt with 1:1:1 ratio composite lime mortar (1Lime:1C Sand: 1Surkhi) including scaffolding and supply of all materials. (Rate Including G.S.T.).
Providing & laying position lime concrete with graded brick aggregate 20-40 mm gage size and 50% composite lime mortar 1:1:1 ratio (1 lime, 1 Surkhi 1 C.Sand,) mixed with composite materials as in floor and foundation including supply of all materials labour, scaffolding, T. & P. etc required for proper completion of work. (Rate Including G.S.T.).
Providing 65-75mm average thick simple molded plaster 1:1:1 ratio composite lime mortar (1Lime :1C.Sand :1Surkhi) mixed with composite materials labour T&P etc. required for proper completion work. (Rate Including G.S.T.).
Supply & fixing red sand stone Slabs/ facing/ dab stone exposed surface fine dress and set in composite lime mortar 1:1:1 (1Lime :1C.Sand :1Surkhi) mixed with composite materials including supply of all materials labour, scaffolding, T&P etc. required for proper completion work. (Rate Including G.S.T.).
R N S BUILDERS
P A SALES CORPORATION
M/s Bhagwan singh
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
TENDERDOCUMENT.pdf
Tender Documents • 10.42 MB
TENDECL.pdf
Additional Documents • 1.61 MB
BOQ_687202.xls
BOQ • 0.29 MB
ELIGIBILITY.pdf
Additional Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .