| 1 | L1₹2.0 CrAccepted-AOC AT KHALARI PO KHALARI PS ANGUL DIST ANGUL PIN 759132 ODISHA | KHALARI | ANGUL | ODISHA | 759132 | ₹2.0 Cr | L1 | Accepted-AOC Successful through Transparent lottery system and work has been awarded |
| 2 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance Unsuccessful through Transparent lottery system |
| 3 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance Unsuccessful through Transparent lottery system |
| 4 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance Unsuccessful through Transparent lottery system |
| 5 | L1₹2.0 CrRejected-Finance | ₹2.0 Cr | L1 | Rejected-Finance Unsuccessful through Transparent lottery system |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
30 Mar 2026, 5:00 pmClosed
Additonal Chief Engineer, AMIC,DKL
ACE,Angul M.I.Circle,DKL
Construction of RCC Lining in Main Canal of Kansabansa MIP(Res) in Chhendipada Block of Angul District under DMF Grant for the year 2025-26
2026_CEMIB_127261_1
AMIC/12/2025-26
Open Tender
Civil Works - Canal
Percentage
ACE, Angul M.I.Circle, DKL
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.0 L
Yes
22 May 2026
16 Mar 2026
31 Mar 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation ,loading,unloading and carriage by mechanical means of all kinds of soil including stoney earth , gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from site as per the specification and as directed by the E.I.C within an initial lead of1km from the place of excavation complete as per the direction of the Engineer- in -Charge | 1 | One cum | 82 | ₹81.92 |
| 2 | Filling in foundaiton and plinth with sand including watering and ramming etc.complete including cost, conveyance ,royalty and all other taxes of all materials with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer in Charge. | 1 | One Cum | 975.8 | ₹974.82 |
| 3 | Cement Concrete work with cement concrete M-15 grade with crushed granite 20mm down graded course aggregate of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge. | 1 | One Cum | 6,093.5 | ₹6,087.41 |
| 4 | Cement Concrete work with cement concrete M-20 using 20 mm down graded hard granite chips of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge. | 1 | One Cum | 6,479.2 | ₹6,472.72 |
| 5 | Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost ,conveyance & all taxes of reinforcement as directed by the Engineer-in-charge. | - | One Cum | 8,541.6 | - |
| 6 | Providing rigid shuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weir, barrage and dam blocks including cost of materials, labour, T & P etc. complete as directed by the Engineer in charge including removal of forms. | - | One Qntl | 289.6 | - |
| 7 | Supplying and fixing Bituminous expansion board (ISI) 12mm thick complete as per drawing andtechnical specification(SR 2022 P-57)complete in all respect as directed by the Engineer-in-charge. | - | One sqm | 859.5 | - |
| 8 | Providing weep holes in plain Reinforced concrete Abutement,wing wall with 100mm diametre AC pipe,extending through the full width of the structure with slope of V:20H towards force. complete in all respect as directed by the Engineer-in-charge. | 1 | One cum | 338.6 | ₹338.26 |
| 9 | Clearing grass and removal of rubbish up o a distance of 50m outside the periphery of the area …etc Complete as per the direction of the Engineer- in -Charge | - | One cum | 2.8 | - |
| 10 | Filling in foundaiton and plinth with excavated material including watering and ramming etc.complete including cost, conveyance ,royalty and all other taxes of all materials with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer in Charge. | 1 | One Rmt | 54.64 | ₹54.59 |
stage.html
html • 0.22 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.59 MB
BOQ_585127.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .