| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹13.9 L+₹63,201.40 (4.75%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | MMM ENTERPRISES | K VINITH MAHARAJAN |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete. | 55.35 | Rm | 1,46,179.35 ₹1,72,491.63 | 1,39,537.35 ₹1,39,537.35 Lowest |
| 2.00 | Providing wooden platform with scaffolding arrangements using 10 to 13cm dia. Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all material, lead, lift, etc., complete. | 9.8 | M3 | 3,116.4 ₹3,677.35 | 2,979.2 ₹2,979.2 Lowest |
| 3.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 5 | M3 | 26,935 ₹31,783.3 | 25,710 ₹25,710 Lowest |
| 4.00 | Removing the spalled/distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface throughly with reebaklens fosroc acid/equivelent with all lead, lift, labour, etc., complete. | 37.4 | M2 | 22,140.8 ₹26,126.14 | 21,131 ₹21,131 Lowest |
| 5.00 | Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete. | 4.3 | M3 | 1,771.6 ₹2,090.49 | 1,689.9 ₹1,689.9 Lowest |
| 6.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 57 | M2 | 2,850 ₹3,363 | 2,736 ₹2,736 Lowest |
| 7.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 130.1 | M2 | 1,301 ₹1,535.18 | 1,301 ₹1,301 Lowest |
| 8.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer incharge including cost of labou, Lead, lift, T&P etc., complete. | 103.1 | M2 | 5,876.7 ₹6,934.51 | 5,567.4 ₹5,567.4 Lowest |
| 9.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete | 54.6 | M2 | 65,574.6 ₹77,378.03 | 62,626.2 ₹62,626.2 Lowest |
| 10.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work - for 10 Cum. | 4 | M3 | 43,796 ₹51,679.28 | 41,808 ₹41,808 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,200
Closing Date
6 Mar 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Renovation and Repair Works in Type 2 Quarters Block No.3 at Analmin Naga
2026_EB_661353_1
CE SE C TTPS Spec.No. 419 25 26
Open Tender
Civil Works - Others
Item Rate
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,200
Yes
9 Mar 2026
19 Feb 2026
7 Mar 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete. | 55.35 | Rm | 78.6 | ₹4,350.51 |
| 2 | Providing wooden platform with scaffolding arrangements using 10 to 13cm dia. Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all material, lead, lift, etc., complete. | 9.8 | M3 | 38.5 | ₹377.3 |
| 3 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 5 | M3 | 5,155.5 | ₹25,777.5 |
| 4 | Removing the spalled/distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface throughly with reebaklens fosroc acid/equivelent with all lead, lift, labour, etc., complete. | 37.4 | M2 | 470.9 | ₹17,611.66 |
| 5 | Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete. | 4.3 | M3 | 9,007.3 | ₹38,731.39 |
| 6 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 57 | M2 | 90.5 | ₹5,158.5 |
| 7 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 130.1 | M2 | 5,533.1 | ₹7,19,856.31 |
| 8 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer incharge including cost of labou, Lead, lift, T&P etc., complete. | 103.1 | M2 | 284.1 | ₹29,290.71 |
| 9 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete | 54.6 | M2 | 277 | ₹15,124.2 |
| 10 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work - for 10 Cum. | 4 | M3 | 87.7 | ₹350.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_793785.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .