Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance AT PO KESINGA BAGAD WARD NO 01 DIST KALAHANDI | KALAHANDI | ODISHA | 766001 | -22.20% | ₹3.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.2 L+₹26,058.39 (6.70%)Admitted-Fee/PreQual/Technical/Finance AT PRATAPPUR PO BADKARLAKOTE P S JAIPATNA DIST KALAHANDI ODISHA | KALAHANDI | ODISHA | -16.99% | ₹4.2 L+₹26,058.39 (6.70%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.4 L+₹51,066.44 (13.1%)Admitted-Fee/PreQual/Technical/Finance AT CAPABANDHU NAGAR BADAPADA PO PS BHAWANIPATNA DIST KALAHANDI | BHAWANIPATNA | KALAHANDI | ODISHA | -11.99% | ₹4.4 L+₹51,066.44 (13.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.5 L+₹61,069.66 (15.7%)Admitted-Fee/PreQual/Technical/Finance | -9.99% | ₹4.5 L+₹61,069.66 (15.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹5,002
Closing Date
22 Jul 2026, 4:00 pmClosed
Executive Engineer (Agriculture)
Kalahandi Division, Bhawanipatna
Construction of Vehicle Shed at FIAC Karlamunda
2026_AGRIL_134647_3
E.E (A) K/D-02/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Karlamunda
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Executive Engineer (Agriculture) Kalahandi Div
₹5,002
Yes
5 Aug 2026
8 Jul 2026
27 Jul 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling etc. complete including cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | - | Cum | 280.08 | - |
| 2 | Filling foundation and plinth with sand well watered and rammed etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Cum | 638.94 | ₹638.3 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Cum | 5,967.59 | ₹5,961.62 |
| 4 | Cement concrete of proportion (1:2:4) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | cum | 7,658.56 | ₹7,650.9 |
| 5 | RCC M20 using black hard crusher broken granite chips of approved quality from approved quarry including centering and shuttering, hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | - | aaa | - | - |
| 6 | Column Base & Plinth Band | - | cum | 6,505.67 | - |
| 7 | Tie Beam | - | cum | 7,371.43 | - |
| 8 | Column & Beam | - | cum | 15,725.19 | - |
| 9 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Qntl | 8,606.89 | ₹8,598.28 |
| 10 | Brick work with Flyash Brick having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:6) in Superstructure etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | - | cum | 5,479.89 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_600064.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .