Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.3 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹13.3 L+₹2.9 L (28.5%)Rejected-Finance CHANDRA LOK COLONY WARD NO 1 NAVALPURA KHURJA BULANDSHAHR | HATHRAS | UTTAR PRADESH | 203001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹14.0 L+₹3.6 L (35.4%)Rejected-Finance | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | NARENDRA KUMAR SHARMA L2 | M/S BHASKAR SHARMA CONTRACTOR L3 | M/s Prince Construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 19,760 | Sqm | 4 ₹79,040 | 4.5 ₹88,920 | 3.2 ₹63,232 Lowest |
| 2.00 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 14,410 | Cum. | 60 ₹8,64,600 | 62 ₹8,93,420 | 47.1 ₹6,78,711 Lowest |
| 3.00 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 80,000 | Sqm | 4 ₹3,20,000 | 4.5 ₹3,60,000 | 3.1 ₹2,48,000 Lowest |
| 4.00 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 33 | Nos. | 600 ₹19,800 | 660 ₹21,780 | 495 ₹16,335 Lowest |
| 5.00 | 1st class brickwork in superstructure in 1:4 Cement mortar using coarse sand i/c cost of all material,labour,T&P etc | 4 | Cum. | 5,600 ₹22,400 | 5,300 ₹21,200 | 4,156 ₹16,624 Lowest |
| 6.00 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour, T&P etc complete as directed by Engineer in charge. | 132 | Sqm. | 70 ₹9,240 | 57 ₹7,524 | 42 ₹5,544 Lowest |
| 7.00 | Painting letters including all cost of material, labour and T&P etc. up to 10 cm ht i/c cost of all material,labour,T&P etc | 100 | Nos | 20 ₹2,000 | 12 ₹1,200 | 9.7 ₹970 Lowest |
| 8.00 | Painting letters including all cost of material, labour and T&P etc. up to 20 cm ht including all labour, T&P etc complete as directed by Engineer in charge. | 170 | Nos | 20 ₹3,400 | 12 ₹2,040 | 10.78 ₹1,832.6 Lowest |
| 9.00 | Painting Gauge including all cost of material, labour and T&P etc. up to 25 cm. width .including all labour, T&P etc complete as directed by Engineer in charge. | 1.4 | RM. | 180 ₹252 | 180 ₹252 | 145.6 ₹203.84 Lowest |
| 10.00 | cement plaster in 1:4 cement & course sand on brick masonary including all labour, T&P etc complete as directed by Engineer in charge. | 0.75 | Sqm. | 6,000 ₹4,500 | 204 ₹153 | 157 ₹117.75 Lowest |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
19 Sept 2026, 12:00 pmClosed
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_11
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹28,000
Yes
2 Oct 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 19,760 | Sqm | - | - |
| 2 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 14,410 | Cum. | - | - |
| 3 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 80,000 | Sqm | - | - |
| 4 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 33 | Nos. | - | - |
| 5 | 1st class brickwork in superstructure in 1:4 Cement mortar using coarse sand i/c cost of all material,labour,T&P etc | 4 | Cum. | - | - |
| 6 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour, T&P etc complete as directed by Engineer in charge. | 132 | Sqm. | - | - |
| 7 | Painting letters including all cost of material, labour and T&P etc. up to 10 cm ht i/c cost of all material,labour,T&P etc | 100 | Nos | - | - |
| 8 | Painting letters including all cost of material, labour and T&P etc. up to 20 cm ht including all labour, T&P etc complete as directed by Engineer in charge. | 170 | Nos | - | - |
| 9 | Painting Gauge including all cost of material, labour and T&P etc. up to 25 cm. width .including all labour, T&P etc complete as directed by Engineer in charge. | 1.4 | RM. | - | - |
| 10 | cement plaster in 1:4 cement & course sand on brick masonary including all labour, T&P etc complete as directed by Engineer in charge. | 0.75 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2230605.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .