| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.3 L+₹2,197.44 (0.35%)Rejected-Finance 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L2 | Rejected-Finance L2 | |
| 3 | L3₹6.3 L+₹6,313.44 (1.01%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L3 | Rejected-Finance L3 | |
| 4 | L4₹6.3 L+₹7,740.32 (1.24%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
23 Nov 2020, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
De watering of ground reservoir and fire fighting reservoir including washing cleaning and developing of the Tube Well at different location at Main Island in connection with Ganga Sagar Mela 2021
2020_PHED_302486_3
WBPHE/EE/SMD/NIeT- 03 of 2020-2021
Open Tender
Electrical Work/ Equipment
Item Rate
45 days
Ganga Sagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹14,000
Yes
31 Aug 2021
20 Oct 2020
25 Nov 2020
20 Oct 2020
23 Nov 2020
20 Oct 2020
Amount
Carrying of engine driven pumps set from Sagar store to work site & back to store after completion of work.
a) Tank No.1 [RA-II] – 2 nos
b) Tank No. 2 [HA-294] – 2 nos
Installation the above pumping machinery incl. Proper shade as per departmental specification at working site near.
a) Tank No. 1 [2nos engine]
b) Tank No. 2 [2 nos engine]
Operation & maintenance of diesel engine RA – II & HA-294 pump set for bailing out storage water by supply of fuel, lubricant sundries & skilled operating staff for Tank No. 1 , 2 & 3
a) RA-II
Operation & maintenance of engine driven (TV – I) pump set of Tank No. 1,2&3 for bailing out storage water till end by supplying skilled operating staff, fuel, lubricants, sundries etc.
Carrying of R.A. II engine driven pump from store to working site and carrying back to store after completion of work at a) Tank No.1 b) Tank No.2 c) Tank No.3 d) Tank No.4 e) Tank No.5 f) Tank No.6 g) Tank No.7 h) Tank No.8 i) Tank No.9 j) Tank No.10 k) Tank No.11
Installation of the above pumping set incl. proper shed as per departmental specification at working site. a) Tank No.1 b) Tank No.2 c) Tank No.3 d) Tank No.4 e) Tank No.5 f) Tank No.6 g) Tank No.7 h) Tank No.8 i) Tank No.9 j) Tank No.10 k) Tank No.11
Operation & maintenance of engine driven pump set (departmentally supplied) for bailing out storage water by supplying of fuel lubricants, sundries & skilled operating staff as per direction of E.I.C
Carrying charges of electrical motor driven air compressor with oil tank 50mm dia hose pipe from Sagar store to worksite time to time at different location as per direction
Lowering the hose pipe 150 ft from the tube well and connection of air compressor delivery pipe as per direction in different location
Running and maintenance and guarding of 30 HP electric motor driven air compressor by engaging of skilled mechanic and unskilled labour continue running 6 hrs per day and guarding 24hrs basis[air compressor supplied by department] [ 15 Nos. x 3 Days]
Running of 40 BHP diesel engine driven generator set including supply of diesel oil , lubricants and sundry materials etc for power supply of electrical motor driven air compressor of 3 days x 6hrs x 15 Nos.
Carrying charges of electric driven compressor with fuel tank and all other materials from work site to store after complete the job including loading and unloading all complete.
Hire charges of derrick by supplying salbollah, bamboo etc. for construction a derrick temporary on hire basis for withdrawing & installation the pump motor set.
Carrying charges of submersible pump set with other accessories as per direction
Painting the above pump set and valve specials & column pipe including other necessary accessories of approved shade and quality as per direction.
Installation the above submersible set with column pipe by supplying necessary Materials and tools on hire basis and skilled labour complete before 05.01.2020 as per direction of EIC (pump sets column pipes etc to be supplied by Department)
Withdrawing of submersible pump set (after mela period 18.01.2021) from the tube well after supplying necessary Tools on hire basis and skilled labour as per direction of EIC.
Installation and lowering 25mm dia 3.4mm wall thickness PVC threaded pipe and 40mm dia 3.5mm wall thickness screened ribbed pipe strainer at different tube well and different places
Withdrawing of the above said 25mm dia 3.4mm wall thickness PVC thread pipe and 40mm dia 3.5mm wall thickness ribbed pipe strainer at different tube well and different place and stacking the materials at site store godown
Considering present pandemic situation actual quantity of work may differ from BOQ which shall be finalized by the EIC / competent authority in due course..
Add GST @ 12%
H. DEY ELECTRIC STORES
H.K.DAS AND CO.
B T PROJECTS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .