Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAdmitted-Finance | ₹25.2 L | L1 | Admitted-Finance |
| 2 | L2₹25.2 L+₹7,010 (0.28%)Admitted-Finance | ₹25.2 L+₹7,010 (0.28%) | L2 | Admitted-Finance |
| 3 | L3₹25.3 L+₹16,537 (0.66%)Admitted-Finance | ₹25.3 L+₹16,537 (0.66%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MD HABIBULLAH L3 | GAUTAM ENTERPRISES L1 | Aien Meren Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.01 | Maintenance & Opeartion of water Supply installation inlcuding pumping and water distribution network , routine maintenance and attending day to day complaints receive of entire Kohima Grn in three shift ( each shift of 8 hours) per day employing qualified or experienced 02 plumber in each shift in all as per direction by Engineer-In-Charge. Details of pumps sets and IRP are as under :- (i) Monoblock pump set 5 HP - 07 Nos (ii) Monoblock pump set 7.5 HP - 04 Nos (iii) Submersible Pump set 2 HP - 04 Nos (iv) Iron removal Plant 100GPH - 01 Nos (A) Plumber Note : (aa) Contractor shall be reponsible for any disciplanry case of staff employed (ab) Contractor shall priduce character cerificate (issued by police station) , education/qualifiaction certificate and experience certificate belonging minimum 02 yeras of the staff employed and contractor shall be responsible for any disciplinary case of staff employed. | 1,980 | Shift | 1,160 ₹22,96,800 | 1,152 ₹22,80,960 Lowest | 1,155 ₹22,86,900 |
| 1.02 | Dismantling of existing borewell head pump base plate and associated fixtures | 3 | Job | 2,560 ₹7,680 | 2,550 ₹7,650 Lowest | 2,555 ₹7,665 |
| 1.03 | Flushing and air compressore based cleaning of bore well up to 150m in dia 100 m depth | 300 | RM | 201 ₹60,300 | 200 ₹60,000 Lowest | 202 ₹60,600 |
| 1.04 | Lifting and lowering of submersible pump set using tripod, Chain puly arrangment | 3 | Job | 3,402 ₹10,206 | 3,400 ₹10,200 Lowest | 3,405 ₹10,215 |
| 1.05 | Testing and servicing of submersible pumpset including impeller and bearing check | 3 | Job | 1,602 ₹4,806 | 1,600 ₹4,800 Lowest | 1,605 ₹4,815 |
| 1.06 | Electricial maintenance including Borewell cabling, panel wiring, capacitor replacement & connections | 3 | Job | 20,050 ₹60,150 | 20,000 ₹60,000 Lowest | 20,100 ₹60,300 |
| 1.07 | Rewiding of 5 HP motors with Servicing | 5 | Sets | 4,702 ₹23,510 | 4,700 ₹23,500 Lowest | 4,705 ₹23,525 |
| 1.08 | Repalcement of bearings with greasing | 5 | Sets | 2,903 ₹14,515 | 2,900 ₹14,500 Lowest | 2,902 ₹14,510 |
| 1.09 | Replacement of mechanical seal | 5 | Sets | 933 ₹4,665 | 930 ₹4,650 Lowest | 932 ₹4,660 |
| 1.10 | Replacement of motor shaft | 5 | Sets | 1,085 ₹5,425 | 1,080 ₹5,400 Lowest | 1,082 ₹5,410 |
Tender Value
₹25.2 L
EMD Value
₹50,315
Closing Date
7 Apr 2026, 4:00 pmClosed
SO-1(Wks), HQ IGAR(N)
SO-1(Wks) HQ IGAR(North) Kohima, Nagaland PIN - 797001
Manning and operation of existing Borewell, Pump sets/motors at HQ IGAR(N)
2026_ARMHA_902598_1
VIII.11001/Engr/AMC/2025-26/01
Open Tender
Civil Works - Others
Works
365 days
HQ IGAR(N)
As per tender documents
2 documents required · 2 mandatory
₹1,000
SO-1(Works), HQ IGAR(N)
₹50,315
10 Jul 2026
14 Mar 2026
9 Apr 2026
15 Mar 2026
7 Apr 2026
15 Mar 2026
15 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Maintenance & Opeartion of water Supply installation inlcuding pumping and water distribution network , routine maintenance and attending day to day complaints receive of entire Kohima Grn in three shift ( each shift of 8 hours) per day employing qualified or experienced 02 plumber in each shift in all as per direction by Engineer-In-Charge. Details of pumps sets and IRP are as under :- (i) Monoblock pump set 5 HP - 07 Nos (ii) Monoblock pump set 7.5 HP - 04 Nos (iii) Submersible Pump set 2 HP - 04 Nos (iv) Iron removal Plant 100GPH - 01 Nos (A) Plumber Note : (aa) Contractor shall be reponsible for any disciplanry case of staff employed (ab) Contractor shall priduce character cerificate (issued by police station) , education/qualifiaction certificate and experience certificate belonging minimum 02 yeras of the staff employed and contractor shall be responsible for any disciplinary case of staff employed. | 1,980 | Shift | - | - |
| 1.02 | Dismantling of existing borewell head pump base plate and associated fixtures | 3 | Job | - | - |
| 1.03 | Flushing and air compressore based cleaning of bore well up to 150m in dia 100 m depth | 300 | RM | - | - |
| 1.04 | Lifting and lowering of submersible pump set using tripod, Chain puly arrangment | 3 | Job | - | - |
| 1.05 | Testing and servicing of submersible pumpset including impeller and bearing check | 3 | Job | - | - |
| 1.06 | Electricial maintenance including Borewell cabling, panel wiring, capacitor replacement & connections | 3 | Job | - | - |
| 1.07 | Rewiding of 5 HP motors with Servicing | 5 | Sets | - | - |
| 1.08 | Repalcement of bearings with greasing | 5 | Sets | - | - |
| 1.09 | Replacement of mechanical seal | 5 | Sets | - | - |
| 1.1 | Replacement of motor shaft | 5 | Sets | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_948697.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .