| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L Quoted ₹8.5 L | L1 | Accepted-AOC AWARD OF CONTRACT |
| Sl No | Description | Qty | Unit | HRITHIC CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Clearing light jungle including cost of all materials, labour, lead, lift, etc., complete. | 100 | M2 | 1 ₹100 Lowest |
| 2.00 | Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders Clearing juliflora jungle with uprooting including cost of all materials, labour, lead, lift, etc., complete. | 38 | M3 | 100 ₹3,800 Lowest |
| 3.00 | Supplying and filling of M-sand in foundation and basement with watering and consolidation as per specn. including cost of all materials, labour, lead, lift, etc., complete. (As instructed by the Engineer at site) | 4.5 | M3 | 1,800 ₹8,100 Lowest |
| 4.00 | Providing PCC 1:3:6 mix using 40 mm HBGS Jelly for foundation including cost of materials, labour charges, lead, lift etc, complete (without formwork) | 4 | M3 | 4,200 ₹16,800 Lowest |
| 5.00 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (without formwork) | 6.5 | M3 | 5,500 ₹35,750 Lowest |
| 6.00 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Column up to Basement | 0.7 | M3 | 5,500 ₹3,850 Lowest |
| 7.00 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Grade Beam | 1.4 | M3 | 5,700 ₹7,980 Lowest |
| 8.00 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Column above Basement, up to Ground floor Roof level parapet wall | 2.2 | M3 | 5,800 ₹12,760 Lowest |
| 9.00 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Plinth beam | 0.9 | M3 | 5,500 ₹4,950 Lowest |
| 10.00 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Lintel beam | 1.1 | M3 | 5,500 ₹6,050 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
10 Mar 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Improvement / Extension works with allied civil works in Samayanallur 110/11KV SS
2026_EB_669715_1
SE/GCC/Madurai F. Specn. No.078/2025-26
Open Tender
Civil Works - Buildings
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
30 Jul 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing light jungle including cost of all materials, labour, lead, lift, etc., complete. | 100 | M2 | - | - |
| 2 | Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders Clearing juliflora jungle with uprooting including cost of all materials, labour, lead, lift, etc., complete. | 38 | M3 | - | - |
| 3 | Supplying and filling of M-sand in foundation and basement with watering and consolidation as per specn. including cost of all materials, labour, lead, lift, etc., complete. (As instructed by the Engineer at site) | 4.5 | M3 | - | - |
| 4 | Providing PCC 1:3:6 mix using 40 mm HBGS Jelly for foundation including cost of materials, labour charges, lead, lift etc, complete (without formwork) | 4 | M3 | - | - |
| 5 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (without formwork) | 6.5 | M3 | - | - |
| 6 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Column up to Basement | 0.7 | M3 | - | - |
| 7 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Grade Beam | 1.4 | M3 | - | - |
| 8 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Column above Basement, up to Ground floor Roof level parapet wall | 2.2 | M3 | - | - |
| 9 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Plinth beam | 0.9 | M3 | - | - |
| 10 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Lintel beam | 1.1 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_804832.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].