Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | -37.65% | ₹5.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.1 L+₹6,723.08 (1.35%)Admitted-Fee/PreQual/Technical/Finance | -36.81% | ₹5.1 L+₹6,723.08 (1.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.3 L+₹34,575.81 (6.93%)Admitted-Fee/PreQual/Technical/Finance | -33.33% | ₹5.3 L+₹34,575.81 (6.93%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.5 L+₹46,037.05 (9.23%)Admitted-Fee/PreQual/Technical/Finance | -31.90% | ₹5.5 L+₹46,037.05 (9.23%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹5.5 L+₹53,224.34 (10.7%)Admitted-Fee/PreQual/Technical/Finance | -31.00% | ₹5.5 L+₹53,224.34 (10.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Construction of 20 iron gates at various lanes in Koolipora, Kawmohalla and Nowpora
2026_HAUDD_315490_3
SHORT Term NOTICE INVITING ETENDER No. 11 of 2026-2027 Dated 10.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Kawmohalla and Nowpora
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹301
FA/CAO AC NO 0216010200000007
₹16,000
26 Jul 2026
10 Jul 2026
22 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 5.24 | Cum | 1,725.2 | ₹9,040.05 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.46 | Cum | 6,591.25 | ₹22,805.73 |
| - | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 4,183 | Kgs | 181.6 | ₹7,59,632.8 |
| - | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 17.2 | Sqm | 283.8 | ₹4,881.36 |
| - | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 4.19 | Cum | 350 | ₹1,466.5 |
| - | Carriage of Sand / Aggregate by Head Load | 3.46 | Cum | 331.74 | ₹1,147.82 |
| - | Carriage of Sand / Aggregate by Mechanical Transport | 4.56 | Cum | 305.22 | ₹1,391.8 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1023706.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .