Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC KONERIPATTY PO POOLAMPATTI VIA EDAPPADI SALEM DIST 637 107 | EDAPPADI | SALEM | TAMIL NADU | 637107 | L1 | Accepted-AOC Plus Two Point Zero Percentage Excess over the current departmental value. Hence tender accpeted and work order issued | |
| 2 | L2₹3.0 Cr+₹5.8 L (1.93%)Rejected-Finance NO 11 5 33 A4 SUBRAMANIYA NAGAR NEAR DEEBAM MANDABAM MECHERI METTUR TK SALEM 636 453 | MECHERI | SALEM | TAMIL NADU | 636453 | L2 | Rejected-Finance Plus Seven Point Zero Seven Percentage Excess over the Current Departmental Value | |
| 3 | Rejected-Technical 3 73 B SOORAPALLI POST JALAGANDAPURAM VIA METTUR T K SALEM 636 501 | SALEM | SALEM | TAMIL NADU | 636501 | - | Rejected-Technical Technical Bid Not Qualified |
Tender Value
₹2.9 Cr
EMD Value
₹2.2 L
Closing Date
28 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer TWAD Board Coimbatore
The Chief Engineer TWAD Board No 30 Siruvani Nagar Bharathi park Road Coimbatore 641 043
Replacement of existing AC pipes into HDPE pipes and pumpsets in CWSS to Kattur and 57 other Rural Habitations in Ammapet Union of Erode District
2024_TWAD_510816_2
IFB_07_ 1_ UTM_ Erode_ Kattur_2024
Open Tender
Civil Works
Works
180 days
Kattur
Refer Bid Document
4 documents required · 4 mandatory
₹0
₹2.2 L
11 Apr 2025
7 Jan 2025
29 Jan 2025
7 Jan 2025
28 Jan 2025
7 Jan 2025
7 Jan 2025 - 7 Jan 2025
Amount
Replacement of existing AC pipes into HDPE pipes and pumpsets in CWSS to Kattur and 57 other Rural Habitations in Ammapet Union of Erode District (Construction Period : 6 Months, Trial Run: 1 month and followed by Free Maintenance Period : 2 Months)
Supply, delivery, laying, Jointing & testing of HDPE Pipes for Pumping main from WTP to Poonachi Booster with allied works
Supply, Delivery, Erection and Commissioning of 1408 lpm x 83 m Head Horizontal split casing Centrifugal Pumpset and allied works at Treatment Plant Kesarimangalam
Part - 3 : Maintenance of the Scheme for a period of Two Months (2 months) (Free maintenance)
Add GST @ 18%
Shiva Engineering Work (BID ID -1238696)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .