| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 CrAccepted-AOC | ₹13.8 Cr Quoted ₹14.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹15.8 CrRejected-Finance | ₹15.8 Cr | L2 | Rejected-Finance NOT LOWEST |
| 3 | L3₹16.8 CrRejected-Finance | ₹16.8 Cr | L3 | Rejected-Finance NOT LOWEST |
| 4 | L4₹17.4 CrRejected-Finance SCF 126 OPP SUKHRAJ CINEMA ROSE GARDEN COMPLEX G T ROAD BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | ₹17.4 Cr | L4 | Rejected-Finance NOT LOWEST |
| 5 | L5₹18.3 CrRejected-Finance | ₹18.3 Cr | L5 | Rejected-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | GEMINI PROMOTERS AND BUILDERS PVT. LTD. L3 | Ram Parkash Constructions Pvt. Ltd. L7 | Pooja Singla Builders And Engineers Pvt Ltd L8 | VIJAY JINDAL BUILDERS PVT LTD L5 | M/s DMR Builders Pvt Ltd L4 | NAND LAL PURI AND SONS PRIVATE LIMITED L2 | BALAJI BUILDERS L1 | Som Projects Pvt. Ltd. L6 | MUKUL BUILDERS LLP L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. | ||||||||||||
| 1.01 | Construction of left over works for Offrs Md. Accn (Block of 4 Qtrs G+1) including car garage, servant Qtrs and steel ladder with permanent specification complete all as specified, shown on drawings and as directed. | 1 | Each Block | 1,85,00,000 ₹1.9 Cr | 2,25,00,000 ₹2.3 Cr | 2,50,00,000 ₹2.5 Cr | 2,16,00,000 ₹2.2 Cr | 2,00,00,000 ₹2 Cr | 1,75,00,000 ₹1.8 Cr | 1,45,00,000 ₹1.4 Cr | 2,05,00,000 ₹2.0 Cr | 2,60,00,000 ₹2.6 Cr |
| 1.02 | Construction of left over works for JCO Md. Accn (Block of 12 Qtrs G+2) with permanent specifications complete all as specified, shown on drawings and as directed. | 1 | Each Block | 1,90,00,000 ₹1.9 Cr | 2,00,00,000 ₹2 Cr | 2,15,00,000 ₹2.1 Cr | 1,85,00,000 ₹1.9 Cr | 1,70,00,000 ₹1.7 Cr | 1,95,00,000 ₹1.9 Cr | 1,80,00,000 ₹1.8 Cr | 1,90,00,000 ₹1.9 Cr | 1,95,00,000 ₹1.9 Cr |
| 1.03 | Construction of left over works for OR's Md. Accn (Block of 6 Qtrs G+2) (including scooter shed) with permanent specification for Block No 1, 3, 4, 5, 8 & 10 complete all as specified, shown on drawings and as directed. | 6 | Each Block | 85,00,000 ₹5.1 Cr | 1,00,00,000 ₹6 Cr | 1,10,50,000 ₹6.6 Cr | 92,00,000 ₹5.5 Cr | 88,00,000 ₹5.3 Cr | 77,00,000 ₹4.6 Cr | 70,00,000 ₹4.2 Cr | 98,00,000 ₹5.9 Cr | 1,20,00,000 ₹7.2 Cr |
| 1.04 | Construction of left over works for OR's Md. Accn (Block of 6 Qtrs G+2) (including scooter shed) with permanent specification for Block No 2, 9 & 11 complete all as specified, shown on drawings and as directed. | 3 | Each Block | 75,00,000 ₹2.3 Cr | 92,00,000 ₹2.8 Cr | 98,00,000 ₹2.9 Cr | 90,00,000 ₹2.7 Cr | 80,00,000 ₹2.4 Cr | 70,00,000 ₹2.1 Cr | 61,00,000 ₹1.8 Cr | 87,00,000 ₹2.6 Cr | 1,05,00,000 ₹3.1 Cr |
| 1.05 | Construction of left over works for OR's Md. Accn (Block of 6 Qtrs G+2) (including scooter shed) with permanent specification for Block No 6 & 12 complete all as specified, shown on drawings and as directed. | 2 | Each Block | 80,00,000 ₹1.6 Cr | 91,00,000 ₹1.8 Cr | 1,01,00,000 ₹2.0 Cr | 77,00,000 ₹1.5 Cr | 72,00,000 ₹1.4 Cr | 68,50,000 ₹1.4 Cr | 64,50,000 ₹1.3 Cr | 80,00,000 ₹1.6 Cr | 1,00,00,000 ₹2 Cr |
| 1.06 | Construction of left over works for OR's Md. Accn (Block of 6 Qtrs G+2) (including scooter shed) with permanent specification for Block No 7 complete all as specified, shown on drawings and as directed. | 1 | Each Block | 78,00,000 ₹78 L | 97,00,000 ₹97 L | 1,00,00,000 ₹1 Cr | 86,50,000 ₹86.5 L | 83,00,000 ₹83 L | 72,00,000 ₹72 L | 63,00,000 ₹63 L | 90,00,000 ₹90 L | 1,10,00,000 ₹1.1 Cr |
| 1.07 | Construction of left over works for Car Garage (Block of 6 Cars) with permanent specification complete all as specified, shown on drawings and as directed. | 2 | Each Block | 6,00,000 ₹12 L | 8,25,000 ₹16.5 L | 10,00,000 ₹20 L | 4,50,000 ₹9 L | 8,00,000 ₹16 L | 6,50,000 ₹13 L | 5,00,000 ₹10 L | 7,50,000 ₹15 L | 12,00,000 ₹24 L |
| 2.00NOTE: Schedule ‘A’ Part II to XI under Ser No 2.01 to 2.10 are Prepriced by MES. | ||||||||||||
| 2.01 | Lump sum price worked out by the Contractor for “SITE CLEARANCE AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Pre priced | 9,94,915.2 ₹9.9 L | 15,91,865 ₹15.9 L | 18,03,284.91 ₹18.0 L | 12,43,644.77 ₹12.4 L | 11,81,461 ₹11.8 L | 12,43,644.77 ₹12.4 L | 10,00,000 ₹10 L | 16,16,738.2 ₹16.2 L | 18,65,467 ₹18.7 L |
Tender Value
₹12.5 Cr
EMD Value
₹9.5 L
Closing Date
25 Jul 2025, 6:30 pmClosed
HQ CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM
COMPLETION OF BALANCE WORK FOR DEMOLITION AND RECONSTRUCTION OF OLD MD ACCN (PHASE-II) AT AF STN ADAMPUR
2024_MES_671005_3
CEWAC/ADM/T-14/2024-25
Open Tender
Civil Works
425 days
GE (AF) ADAMPUR
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE (AF) ADAMPUR
₹9.5 L
Yes
18 Nov 2025
4 Jul 2025
28 Jul 2025
4 Jul 2025
25 Jul 2025
18 Jul 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid