Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | mayil engineering L2 | Sri Constructions L1 |
|---|---|---|---|---|---|
| 1.00Dismantling of Brick work in cement morter wall clearing away and carefully stacking materils useful for re - use including all labour charges etc., complete as per standard specification and as directed by the departmental officer. | |||||
| 1.10 | EX Drain | 6 | M3 | 280 ₹1,680 | 257 ₹1,542 Lowest |
| 1.20 | ROAD | 22 | M3 | 490 ₹10,780 | 441.5 ₹9,713 Lowest |
| 2.00Earthwork excavation for foundation and depositing on Bank with metal lead of 10m and initial of 2m in Hard stiff clay, stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all labour charges etc.complete as per SS 20 B TNDSS No 23, 24 VI(S2),VI, VII.9 & 10 | |||||
| 2.10 | Drain | 6 | M3 | 180 ₹1,080 | 168 ₹1,008 Lowest |
| 3.00 | Cement concrete of mix 1:4:8 (one part of cement, and four part of M sand, and eaight part of coarse aggregate) using hard broken granite stone jelly of 40 mm gauge for foundation levelling course, including shuttering, dewatering wherever necessary and laid I layers of not more than 15cm thick complete complying with standard specifications and drawings and as directed by the departmental Engineers including all cost & conveyance of materials laying curing etc., complete as per TNDSS No 28V,VI(S2),VI(S54) and VII | 38 | M3 | 5,100 ₹1,93,800 | 4,937 ₹1,87,606 Lowest |
| 4.00Supplying and erecting centering for sides and soffits including supports and srtutting upto 3.29mm height for plane surfaces in all floors with cross bracings using miled steel sheets of size 30cm x 60cm and 10 gauge stiffened welded with miled steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood).Joists of size 10cm x 6.5cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced 75cm centre to centre etc., complete complying with standard specification ans as directed for the following items as per TNDSS No 30 & 86 | |||||
| 4.10 | A)Side wall | 34 | M2 | 310 ₹10,540 | 286 ₹9,724 Lowest |
| 5.00 | Vibrated Cement concrete of 1:3:6 mix (one part of cement, and three part of M sand, and six part of coarse aggregate) using hard granite stone jelly of 20mm gauge for sidewall concrete works excluding shuttering , including dewatering wherever necessary including the cost of all materials and labour charges for mixing concrete and curing etc. complete as per TNDSS No.24 | 6 | M3 | 5,980 ₹35,880 | 5,641 ₹33,846 Lowest |
| 6.00 | Plastering with cement mortal 1:3 mix using 10 mm thick including cost and conveyance of all materials to site and all labour charges etc., complete as per stand specification. | 59 | M2 | 350 ₹20,650 | 285.5 ₹16,844.5 Lowest |
Tender Value
₹5.8 L
EMD Value
₹11,600
Closing Date
6 Dec 2023, 3:00 pmClosed
Executive officer
Annur Town Panchayat
Reconstruction of the Storm water drain at ward no.06 ANP mill lane and Relaying cement concrete pavement at Anandha theater backside cross street in Annur Town Panchayat
2023_DTP_395694_1
231/2023/A2
Open Tender
Civil Works
Works
90 days
Annur town Panchayat
as per norms
1 document required · 1 mandatory
₹0
₹11,600
20 Jun 2026
2 Dec 2023
6 Dec 2023
2 Dec 2023
6 Dec 2023
2 Dec 2023
2 Dec 2023 - 6 Dec 2023
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .