| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.1 L | L1 | Accepted-Finance L1 |
| 2 | Rejected-Technical 2 206 C PONNAGAR METTUR DAM 636 401 SALEM DISTRICT | SALEM | TAMIL NADU | 636401 | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for disconnection of power cable de- coupling the motor from pump and checking alignment of the motor shaft with pump shaft. | 1 | Nos | 7,755 ₹7,755 |
| 2.00 | Charges for removal of end covers and measuring the air gap and magnetic axis. | 1 | Nos | 2,631 ₹2,631 |
| 3.00 | Charges for removal of water line pipes, cooler assembly and lifting the cooler unit to a convenient location. | 1 | Nos | 5,338 ₹5,338 |
| 4.00 | Charges for removal of sleeve bearings, resting the rotor on the stator after placing rubber sheet. | 1 | Nos | 12,236 ₹12,236 |
| 5.00 | Charges for removal of foundation bolts, lifting the existing motor to a convenient location. | 1 | Nos | 12,236 ₹12,236 |
| 6.00 | Charges for lifting and erection of the spare HT motor | 1 | Nos | 12,236 ₹12,236 |
| 7.00 | Charges for assembling of sleeve bearings, checking the interference between the bearings and housing, checking the clearance between shaft and bearing. | 1 | Nos | 12,236 ₹12,236 |
| 8.00 | Charges for assembling the end covers, checking air gap and magnetic axis. | 1 | Nos | 2,631 ₹2,631 |
| 9.00 | Charges for lifting the cooler assembly, fixing with motor and connecting the water pipes etc. | 1 | Nos | 5,338 ₹5,338 |
| 10.00 | Charges for termination of power cable, coupling the pump with motor and checking alignment of the motor shaft with pump shaft. | 1 | Nos | 7,755 ₹7,755 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
8 Jan 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPSI ES Circle EMI SDIV Replacement of any one of the defective 6.6KV, 3500KW , BHEL make BFP HT Motor by 6.6KV 3500KW BHEL make healthy spare BFP HT motor and replacement of anyone of the defective 6.6KV 500 KW CEP HT motor by healthy spare 6.6KV
2025_EB_633299_1
CE-MTPSI-SE-ES-EMI-OT103-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,000
Yes
20 Jan 2026
17 Dec 2025
9 Jan 2026
17 Dec 2025
8 Jan 2026
17 Dec 2025
Charges for disconnection of power cable de- coupling the motor from pump and checking alignment of the motor shaft with pump shaft.
Charges for removal of end covers and measuring the air gap and magnetic axis.
Charges for removal of water line pipes, cooler assembly and lifting the cooler unit to a convenient location.
Charges for removal of sleeve bearings, resting the rotor on the stator after placing rubber sheet.
Charges for removal of foundation bolts, lifting the existing motor to a convenient location.
Charges for lifting and erection of the spare HT motor
Charges for assembling of sleeve bearings, checking the interference between the bearings and housing, checking the clearance between shaft and bearing.
Charges for assembling the end covers, checking air gap and magnetic axis.
Charges for lifting the cooler assembly, fixing with motor and connecting the water pipes etc.
Charges for termination of power cable, coupling the pump with motor and checking alignment of the motor shaft with pump shaft.
Charges for tightening of bed bolts, foundation bolts, checking the IR value, DC resistance and trial run the motor in decouple/ couple condition running the motor satisfactorily.
CEP MOTOR: Charges for disconnection of power cable. De-coupling of the motor from pump, measuring alignment. (Existing motor).
Charges for removal of foundation bolts and lifting the existing motor to a convenient location.
Charges for lifting the spare motor, placing at motor bed and tightening of foundation bolts, bed bolts etc.
Charges for termination of power cable, coupling the spare motor with pump, checking alignment and trial run.
Charges for Balancing at the time of trial run in presence of vibration wing.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_757702.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid