Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,157.20Accepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹46,075.39+₹1,918.19 (4.34%)Accepted-AOC | L2 | Accepted-AOC ok |
Tender Value
₹49,000
Closing Date
8 Feb 2022, 12:00 pmClosed
Ramesh Kumar XEN HWS Div. Hisar
Ramesh Kumar XEN HWS Div. Hisar
Removing obstruction of culvert at O/L RD 97235-L Balsamand Sub Branch.
2022_HRY_205917_5
HWS-8.2.2022
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Hisar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
Yes
6 Apr 2022
1 Feb 2022
8 Feb 2022
1 Feb 2022
8 Feb 2022
1 Feb 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. (HSR 4.12.1)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: Cement concrete 1:3:6 (HSR 6.1.4)
Brick work with common burnt clay nonmodular bricks 1:5 of class designation 7.5 in F&P in cement mortar 1:5.
Cement plaster 1:4 in brick walls Rs.94.00 (HSR 11.5.3)
RCC pipe NP-2 450 mm dia HR B1212 @Rs.660/- mtr.
Reinforced cement concrete work in beams, suspended floors,roofs having slop up to 15° landings, balconies, shelves,chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding thecost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement: 1.5 coarsc sand(zone-11 1) : 3 graded stone aggregate 20 mm nominal sizc) HSR 6.16
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. HSR 6.29.2 @ Rs. 316/-
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Thermo-Mechanically Treated bars of grade Fe-500D HSR 6.33.6
Gurmeet Singh
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .