| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC 223 4TH STREET SIVANANDHAPURAM SARAVANAMPATTI PO COIMBATORE 641 035 | COIMBATORE | TAMIL NADU | 641035 | ₹7.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.5 LRejected-AOC | ₹8.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s A.Chelladurai & Co L2 | ssk builders L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete as per standard specification. | 47 | M3 | 150 ₹7,050 | 200 ₹9,400 |
| 2.00 | PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation and flooring including cost of all materials, curing, labour, lead, lift, etc. complete. | 5 | M3 | 6,500 ₹32,500 | 5,000 ₹25,000 |
| 3.00 | RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for raft foundation with form work including cost of all materials, curing, vibrating charges, centering, labour, lead, lift, etc., complete, but excluding cost of steel reinforcement. | 14 | M3 | 10,000 ₹1.4 L | 9,500 ₹1.3 L |
| 4.00 | RCC 1:1.5:3 mix using 20mm HBS machine crushed metal for foundation Cable duct wall including cost of all materials, Steel Shuttering,curing, labour, lead, lift, etc. complete. | 9.5 | M3 | 15,000 ₹1.4 L | 10,000 ₹95,000 |
| 5.00 | RCC 1:1 1/2 :3 mix using 12 to 20mm HBG machine crushed metal, for cable duct cover slab with form work including cost of all materials labour, curing, centering, lead, lift etc., complete as per standard specification. (But excluding cost of steel reinforcement) | 5.25 | M3 | 12,600 ₹66,150 | 12,500 ₹65,625 |
| 6.00 | Providing steel reinforcement MS/RTS rod for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening, bending, placing aligning and tying properly including cost of all materials lead and lift, etc., complete as per standard specification. | 2,565 | Kgs | 95 ₹2.4 L | 86 ₹2.2 L |
| 7.00 | Labour charge for transporting of all types of cable duct cover slab to working site from curing tank, keeping in in position with proper alignment including labour, lead, lift, etc., complete. | 580 | Nos | 100 ₹58,000 | 75 ₹43,500 |
| 8.00 | Disposal of surplus earth for a distance of 100 mtrs including spreading and levelling, labour, lead, lift, etc., complete. | 19 | M3 | 100 ₹1,900 | 100 ₹1,900 |
| 9.00 | Supplying and fixing of GI angles of above 50x50x6mm size horizontally @ 50cm c/c to the required length for supporting the cable in the cable duct in correct position including fabrication, labour, lead,lift, etc., complete as per standard specification. | 114 | Kgs | 180 ₹20,520 | 100 ₹11,400 |
| 10.00 | Plastering with CM ( 1:5 ) 12mm thick for wall top surface including cost of all materials, curing, labour, lead, lift etc., complete. | 31 | M2 | 300 ₹9,300 | 250 ₹7,750 |
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
28 Jan 2026, 2:00 pmClosed
SE GCC CBE
Office of the Superintending Engineer 182 Dr Subbarayan Street Tatabad Coimbatore 641 012
Providing cable duct for laying ADSS from gantry yard to control room at Myvadi 400 230KV SS
2026_EB_643947_1
ETS No. 54/25-26 of SE GCC Cbe
Open Tender
Civil Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,500
Yes
11 Mar 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete as per standard specification.
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation and flooring including cost of all materials, curing, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for raft foundation with form work including cost of all materials, curing, vibrating charges, centering, labour, lead, lift, etc., complete, but excluding cost of steel reinforcement.
RCC 1:1.5:3 mix using 20mm HBS machine crushed metal for foundation Cable duct wall including cost of all materials, Steel Shuttering,curing, labour, lead, lift, etc. complete.
RCC 1:1 1/2 :3 mix using 12 to 20mm HBG machine crushed metal, for cable duct cover slab with form work including cost of all materials labour, curing, centering, lead, lift etc., complete as per standard specification. (But excluding cost of steel reinforcement)
Providing steel reinforcement MS/RTS rod for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening, bending, placing aligning and tying properly including cost of all materials lead and lift, etc., complete as per standard specification.
Labour charge for transporting of all types of cable duct cover slab to working site from curing tank, keeping in in position with proper alignment including labour, lead, lift, etc., complete.
Disposal of surplus earth for a distance of 100 mtrs including spreading and levelling, labour, lead, lift, etc., complete.
Supplying and fixing of GI angles of above 50x50x6mm size horizontally @ 50cm c/c to the required length for supporting the cable in the cable duct in correct position including fabrication, labour, lead,lift, etc., complete as per standard specification.
Plastering with CM ( 1:5 ) 12mm thick for wall top surface including cost of all materials, curing, labour, lead, lift etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_771593.xls
BOQ • 0.72 MB
54s.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid