Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| Sl No | Description | Qty | Unit | M/s. P.N.MORE L2 | M/s.Bhushan J Pawade L1 | PRANSHU ENGINEERS AND CONTRACTORS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Mechanized /manual Cutting of wild vegetation consisting of wild grass, thorny bushes, wild shrubs such as ber , subabhool , babhool etc. upto 100 mm girth at 1 m. height from ground level ,collecion of cut grass, wild vegetation at designated places, subsequent mechanical transportation of collected grass upto lead of 3.0 km. and safe disposal of collected grass by depositing in pit etc. complete. as per specifications & directions of Engineer In Charge.
A) Areas to be cut 6 times during contract period = 104275.25 m2
So quantity = 104275.25 m2 x 6 operations = 625651.50 m2
B) Areas to be cut 5 times during contract period = 222067 m2
So quantity = 222067 m2 x 5 operations = 1110335 m2
Total Quantity = 625651.50 m2 + 1110335 m2 = 1735986.50 m2 Say 1735987 m2 | 17,35,987 | sq m | 8 ₹1,38,87,896 | 7.4 ₹1,28,46,303.8 Lowest | 8.25 ₹1,43,21,892.75 |
| 2.00 | Mechanized /manual area clerance works by cutting of existing rank vegetation at ground level followed by scrapping the left over wild vegetation, bushes unwanted plants etc. with pick axe & spade to make the area totally clear of wild vegetation, collection of scrapped vegetation ,other debris etc. subsequent mechanical transportation of collected debris to a lead of 3.0 km and disposal by depositing in pits etc. complete as per specifications & directions of Engineer - In - Charge.
Total area available = 3704.00 m2
This area has to be scrapped 4 times in contract period
So quantity = 3704.00 m2 x 4 operations = 14816.00 m2 | 14,816 | sq m | 12 ₹1,77,792 Lowest | 14 ₹2,07,424 | 15 ₹2,22,240 |
| 3.00 | Cutting and removal of all types of creepers dead & alive from chain link fencing of height up to 2.50 m & from 1.0 m area on both sides of fence, collection of cut creepers, subsequent mechanical transportation of collected creepers upto a lead of 3.0 km and disposalof cut creepers at designated places by depositing in pit etc. complete as per specifications and directions of Engineer-In-Charge.
So Quantity = 4116.00 RM x 6 operations = 24696.00 RM. | 24,696 | RM | 50 ₹12,34,800 | 45 ₹11,11,320 Lowest | 48 ₹11,85,408 |
| 4.00 | Hiring of hydraulic excavator for site clearance works by cutting & uprooting of wild thorny bushes of babhul , ber ,subabhool etc, removal of, underground root portion of uprooted plants shifting of excavated soil to low lying area, shifting of boulders & other debris from excavation etc. as per directions of Engineer-In-Charge. | 640 | Per Hour | 1,500 ₹9,60,000 | 1,430 ₹9,15,200 Lowest | 1,600 ₹10,24,000 |
| 5.00 | Arresting the weed growth by manual rough dressing of open areas followed by levelling and fine dressing of open areas followed by providing, laying, fixing of heavy duty, durable , UV resistant weed control barrier having thickness of 125 GSM ,landscape woven fabric sheet made from 100% polypropylene on upper surface of leveled open areas etc. complete as per specifications and directions of Engineer-In-Charge. | 13,750 | sq m | 66 ₹9,07,500 | 65 ₹8,93,750 Lowest | 67 ₹9,21,250 |
| 6.00 | Providing & spraying of weedicide containing Glyphosate 41 % S.L. as a.i. for killing weeds wild grass . The chemical shall be applied @ 15 ml /lit of water . The weedicide shall be sprayed uniformly by pesitice foot sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge.
Note : The Contractor shall bring weedicide chemical and spraying pump at his own cost .
Total area available = 27980.00 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 27980 x 5 =139900 m2 | 1,39,900 | sq m | 7 ₹9,79,300 | 6 ₹8,39,400 | 5 ₹6,99,500 Lowest |
| 7.00 | Chemical control of wild vegetation by Providing & spraying of post emmergent weedicide containing metribuzin 70 % WP as a.i. for killing weeds wild grass . The chemical shall be applied @ 20gm in 10 lit water for 100 m2 area . The weedicide shall be sprayed uniformly bysuitable weedicide sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge. Note : The Contractor shall bring weedicide chemical and spraying pump at his own cost .
Total area available = 12635 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 12635x5 =63175.00 m2 | 63,175 | sq m | 3.5 ₹2,21,112.5 Lowest | 4 ₹2,52,700 | 4.5 ₹2,84,287.5 |
| 8.00 | Providing & spraying of weedicide containing Indoziflam20 + Glyphosate IPA 540 SL(1.65w/w+ 44.63 w/w) . for controlling tough weeds like Parthenium hysterophorus, Cyperus rotundus, Euphorbia sp., Amaranthus sp. Ageratum sp., Borreria sp., Eleusine indica etc for longer period . The chemical shall be applied @ 1000 gm /200lit of water covering 4000 m2 area . The weedicide shall be sprayed uniformly by pesitice sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge.
Total area available = 36000 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 36000x5 =180000 .00 m2 | 1,80,000 | sq m | 5 ₹9,00,000 | 4.4 ₹7,92,000 Lowest | 4.9 ₹8,82,000 |
| 9.00 | Providing & spraying of weedicide containing Halosulfuron Methyl 75% WG which is Selective i.e targeting specific types of plants (in this case, Cyperus rotundus) without affecting others. . The chemical shall be applied @ 36gm /150 lit of water covering 4000 m2 area . The weedicide shall be sprayed uniformly by pesticide sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge. Note : The Contractor shall bring weedicide chemical and spraying pump at his own cost .
Total area available = 25220 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 25220 x 5 =126100. 00 M2 | 1,26,100 | sq m | 4 ₹5,04,400 | 4 ₹5,04,400 | 3.9 ₹4,91,790 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
6 May 2026, 3:00 pmClosed
DIRECTOR GSO NRB Tarapur
BARC Tarapur Tal and DIst Palghar
Cutting and disposal of wild vegetation and other allied works at BARC Staff Colony Tarapur for the year 2026 to 2028.
2026_NRB_905848_1
BARCT/NRB/GSO/EMC/L and H /LHT-13/2026/02 Dt. 07/04/2026
Open Tender
Agricultural or Forestry
Works
730 days
BARC Staff Colony Tarapur
As mentioned in NIT
4 documents required · 4 mandatory
₹0
₹3.5 L
7 Jul 2026
20 Apr 2026
8 May 2026
20 Apr 2026
6 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mechanized /manual Cutting of wild vegetation consisting of wild grass, thorny bushes, wild shrubs such as ber , subabhool , babhool etc. upto 100 mm girth at 1 m. height from ground level ,collecion of cut grass, wild vegetation at designated places, subsequent mechanical transportation of collected grass upto lead of 3.0 km. and safe disposal of collected grass by depositing in pit etc. complete. as per specifications & directions of Engineer In Charge.
A) Areas to be cut 6 times during contract period = 104275.25 m2
So quantity = 104275.25 m2 x 6 operations = 625651.50 m2
B) Areas to be cut 5 times during contract period = 222067 m2
So quantity = 222067 m2 x 5 operations = 1110335 m2
Total Quantity = 625651.50 m2 + 1110335 m2 = 1735986.50 m2 Say 1735987 m2 | - | sq m | - | - |
| 2 | Mechanized /manual area clerance works by cutting of existing rank vegetation at ground level followed by scrapping the left over wild vegetation, bushes unwanted plants etc. with pick axe & spade to make the area totally clear of wild vegetation, collection of scrapped vegetation ,other debris etc. subsequent mechanical transportation of collected debris to a lead of 3.0 km and disposal by depositing in pits etc. complete as per specifications & directions of Engineer - In - Charge.
Total area available = 3704.00 m2
This area has to be scrapped 4 times in contract period
So quantity = 3704.00 m2 x 4 operations = 14816.00 m2 | - | sq m | - | - |
| 3 | Cutting and removal of all types of creepers dead & alive from chain link fencing of height up to 2.50 m & from 1.0 m area on both sides of fence, collection of cut creepers, subsequent mechanical transportation of collected creepers upto a lead of 3.0 km and disposalof cut creepers at designated places by depositing in pit etc. complete as per specifications and directions of Engineer-In-Charge.
So Quantity = 4116.00 RM x 6 operations = 24696.00 RM. | - | RM | - | - |
| 4 | Hiring of hydraulic excavator for site clearance works by cutting & uprooting of wild thorny bushes of babhul , ber ,subabhool etc, removal of, underground root portion of uprooted plants shifting of excavated soil to low lying area, shifting of boulders & other debris from excavation etc. as per directions of Engineer-In-Charge. | - | Per Hour | - | - |
| 5 | Arresting the weed growth by manual rough dressing of open areas followed by levelling and fine dressing of open areas followed by providing, laying, fixing of heavy duty, durable , UV resistant weed control barrier having thickness of 125 GSM ,landscape woven fabric sheet made from 100% polypropylene on upper surface of leveled open areas etc. complete as per specifications and directions of Engineer-In-Charge. | - | sq m | - | - |
| 6 | Providing & spraying of weedicide containing Glyphosate 41 % S.L. as a.i. for killing weeds wild grass . The chemical shall be applied @ 15 ml /lit of water . The weedicide shall be sprayed uniformly by pesitice foot sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge.
Note : The Contractor shall bring weedicide chemical and spraying pump at his own cost .
Total area available = 27980.00 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 27980 x 5 =139900 m2 | - | sq m | - | - |
| 7 | Chemical control of wild vegetation by Providing & spraying of post emmergent weedicide containing metribuzin 70 % WP as a.i. for killing weeds wild grass . The chemical shall be applied @ 20gm in 10 lit water for 100 m2 area . The weedicide shall be sprayed uniformly bysuitable weedicide sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge. Note : The Contractor shall bring weedicide chemical and spraying pump at his own cost .
Total area available = 12635 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 12635x5 =63175.00 m2 | - | sq m | - | - |
| 8 | Providing & spraying of weedicide containing Indoziflam20 + Glyphosate IPA 540 SL(1.65w/w+ 44.63 w/w) . for controlling tough weeds like Parthenium hysterophorus, Cyperus rotundus, Euphorbia sp., Amaranthus sp. Ageratum sp., Borreria sp., Eleusine indica etc for longer period . The chemical shall be applied @ 1000 gm /200lit of water covering 4000 m2 area . The weedicide shall be sprayed uniformly by pesitice sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge.
Total area available = 36000 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 36000x5 =180000 .00 m2 | - | sq m | - | - |
| 9 | Providing & spraying of weedicide containing Halosulfuron Methyl 75% WG which is Selective i.e targeting specific types of plants (in this case, Cyperus rotundus) without affecting others. . The chemical shall be applied @ 36gm /150 lit of water covering 4000 m2 area . The weedicide shall be sprayed uniformly by pesticide sprayer to attain proper results and weed killing shall be prominent . The work shall be done as per specification and as directed by Engineer-In-Charge. Note : The Contractor shall bring weedicide chemical and spraying pump at his own cost .
Total area available = 25220 m2 Three operations of weedicide to be done during the contrac period
So quantitty = 25220 x 5 =126100. 00 M2 | - | sq m | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
Tendernotice_2.pdf
PDF • 1.36 MB
TenderDOCLHT13.pdf
Tender Documents • 3.86 MB
TechbidLHT13.xls
Additional Documents • 0.09 MB
BOQ_952144.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].