| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | +0.00% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance AT HARIPUR ROAD P O BUXIBAZAR DIST CUTTACK | +0.00% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance AT BARABODIA SALIPUR PO PATAPUR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | +0.00% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance AL BARBODIA PO PATPUR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | +0.00% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
22 May 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Toilet at back side of Light House in Ward no.42
2026_ORULB_127820_18
MC(CMC)CTC_Div-IIINo4/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹7,800
Yes
4 Jun 2026
12 May 2026
28 May 2026
12 May 2026
22 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil including dressing and leveling the bed and depositing the soil with intial lead and lift etc complete. | 15.68 | Cum | 299.52 | ₹4,695.5 |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 7.05 | Cum | 612.7 | ₹4,319.84 |
| 3 | Providing cement concrete for unreinforced cement concrete works of proportion (1:3:6) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for __ days complete as per specification drawing and direction of the Engineer-in-charge. | 3.99 | Cum | 6,393.8 | ₹25,520.85 |
| 4 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in F&P. | 5.03 | Cum | 5,538.3 | ₹27,848.23 |
| 5 | Column Base R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 4.1 | Cum | 6,925.12 | ₹28,420.69 |
| 6 | Plinth bend R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 1.76 | Cum | 7,795.47 | ₹13,739.52 |
| 7 | RCC Column & Beam R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 2.25 | Cum | 18,597.01 | ₹41,892.09 |
| 8 | RCC lintels R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 0.36 | Cum | 14,588.47 | ₹5,251.85 |
| 9 | Chajja R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 1.5 | Cum | 1,264.19 | ₹1,896.29 |
| 10 | ROOF Slab R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 2.66 | Cum | 14,173.05 | ₹37,669.34 |
stage.html
html • 0.02 MB
finance_590920.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_590920.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .