PR & CC
Worley on behalf of Ms Hindustan Petroleum Corporation Limited (HPCL) invites bids through e-tendering
20000294-HD-10120
20000294-HD-10120
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
Exempted
30 Oct 2020
9 Oct 2020
30 Oct 2020
30 Oct 2020
9 Oct 2020 - 17 Oct 2020
16 Oct 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | HDD_KRISHNA | HDD_KRISHNA — INSTALLATION OF PIPELINE ACROSS MAJOR CROSSINGS BY HDD -Krishna River, Crossing Number - CS-71 at Ch. 55+077 kmComplete work of the water body crossing (between the ROW limits as defined in Crossing Drawings enclosed with Bid Document) by HDD method including "Receiving and taking over" owner supplied three layer PE/PP coated line pipes from Owner's designated place of issue/dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling loading, unloading, aligning etc. supply of all Contractor supplied material including required length of CS conduit for OFC laying of size 6"; 6.4mm thk. of A106 Gr.B/API 5L Gr.B/IS 3589/IS1239 or equivalent ERW pipe (supply & laying of HDPE and laying of free issued OFC shall be quoted separately elsewhere in the SOR) to work site(s), manpower, equipment, other resources and aquiring the required land for storage, fabrication inclduing string preparation of pipes, ovality check at pipe edges before installation/laying, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve and repair of pipeline coating with special repair patch materials as per Specification, pre-test, hardware / software required for commissioning the above system.In-situ pre-construction survey including auger bore(s) of minimum 6.0 M depth (in the middle third of waterway; at least 1 in each waterbody and at interval of 50M centres) to establish bed strata, its bore log by soil testing; obtaining historical data/ scour depth from concerned authority ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata, all depth to accommodate the pipeline and CS conduit for OFC laying at all conditions of the water crossings by HDD methods for providing with minimum cover either as indicated in Tender Documents or as required by concerned authority or site & technical requirement and In case of multiple combined crossing i.e. RiveR alongwith road/ drain, minimum cover requirement as per specification/ concerned authority for each type of crossing has also to be fulfilled.Laying of the pipeline by the approved HDD method across the water crossing including, strings preparation of pipes, welding, testing, radiography, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent and repair of pipeline coating with special PERP-80 repair patch or equivalent material as per specification, prehydrotest of complete strings made for crossing etc. Backfilling of the ditch/ trench including restoration and clean-up of area etc. to the satisfaction of Engineer-in-charge/ Concerned Authority.Post installation hydrotest dewatering and tie-in with pipeline at either banks etc.All other works including pigging, cleaning, final hydrotesting etc. including repair of defects and retesting, etc. for defects attributed to Contractor's faulty work, Supply, fabrication and construction of protective fencing as required, Restoration and clean-up etc., Preparation of as-built drawings and other records etc., required as per specification, and all other works in accrodance with approved drawings, calculations, methods and to the satisfaction of Engineer-in-charge and/ or as directed by concerned Authority.Preparation of detailed construction method statements and calculations for Owner'sApproval.Note:-1. Width of below crossings shall be as per requirement at site for crossing at different locations.2. Width of the crossings are indicated in respective Crossing drawing enclosed with the tender document. Crossing width may vary as per site condition. String length for HDD shall vary as per design calculations so that pipe is not under stress as permitted by codes/specifications. However final length of string & cover from top of pipe shall be decided and approved by concerned Authority / Engineer-in-charge.3. It is sole descretion of the Contractor to do HDD crossing of mainline pipe as well as CS conduit pipe either by suitabily strapping together both the carrier pipe & CS conduit and pulled through the same drill hole or making separate HDD(preferable seperate) for 6" CS conduit for OFC laying at minimum 4m distance apart from centreline of HDD of mainline. No separate payment for HDD for 6" CS conduit shall be paid.4. Payment for the length of final tied-in carrier pipeline string with mainline and CS conduit laid by HDD method are inclusive in the above item rate and no separate payment shall be made under other clause mentioned elsewhere.5.Pipeline Detail: Size:- Line pipe 406mm, Material:-API 5L Gr. X-65 PSL2, Coating:-3LPP/3LPE | - | Meters |
| 2 | HDD_Preservation 3 months | HDD_Preservation 3 months — IDLE TIME PRESERVATION OF PIPELINEPRESERVATION OF PIPELINE: Preservation of complete pipeline and associated facilities and its maintenance including supply of all consumables, all equipment , man-power, etc. complete as per the requirements of specifications, other provsions of Contract document and instructions of Engineer-In-Charge . By filling and pressurising with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor tomaintain the effectiveness of the inhibitor water for the following details:(Pipeline Size 16", Pressure in bar (g) - 05, Specified period - 1st to 3rd Month ).The Contractor shall be responsible for dewatering the entire line after water treatment as per the specifications and arranging required approvals from Owner,Local and statutory authorities as applicable. | - | Meters |
| 3 | HDD_Preservation 6 months | HDD_Preservation 6 months — IDLE TIME PRESERVATION OF PIPELINEPRESERVATION OF PIPELINE: Preservation of complete pipeline and associated facilities and its maintenance including supply of all consumables, all equipment , man-power, etc. complete as per the requirements of specifications, other provsions of Contract document and instructions of Engineer-In-Charge . By filling and pressurising with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor tomaintain the effectiveness of the inhibitor water for the following details:(Pipeline Size 16", Pressure in bar (g) - 05, Specified period - 1st to 6th Month ).The Contractor shall be responsible for dewatering the entire line after water treatment as per the specifications and arranging required approvals from Owner,Local and statutory authorities as applicable. | - | Meters |
| 4 | HDD_MCP_EGP | HDD_MCP_EGP — Mobilisation/demobilisation of, pigging tools, tackles, consumables, accessories and personnel by contractor at work site including but not limited to magneticpig, electronic geometry pigs and pig tracking device, temporary launcher and receiver as per specification and other provision of the bid document includingsupply of material, equipment, manpower, etc. as required for geometry inspection and magnet cleaning of 16" diameter Vijayawada - Dharmapuri Pipelinesection.Running of adequate runs of magnet pigs for pipeline including pig tracking for each segment, preparation of site report as per specification and provision of BID DOCUMENT for 16" diameter Vijayawada -Dharmapuri Pipeline section.Running adequate runs of electronic geometry pig (caliper) including pig tracking for each segment, preparation of site report on pipeline, data analysis at Contractors facility as per specification and provisions of the BID DOCUMENT for 16" diameter Vijayawada - Dharmapuri Pipeline section.Preparation of final WORK report as per pre agreed format and submission to CONSULTANT / Owner in total of 4 copies for Vijayawada - Dharmapuri Pipelinesection. | - | Meters |
| 5 | HDD_HDPE Duct - | HDD_HDPE Duct - — Supply, Handling, Transportation to site, Erection & Installation of 40 mm OD, permanently lubricated HDPE duct, end plugs, jointing and testing of HDPE ducts as per the specifications mentioned else where in the Tender. | - | Meters |
| 6 | HDD OFC LAYING | HDD OFC LAYING — Handling, Transportation to site, Erection & Installation of 12 Core G.655 fiber in permanently lubricated HDPE duct by OFC blowing including, Jointing by fusion splice & testing of OFC as per the specifications mentioned else where in the Tender.(Note: OFC shall be free issued to Bidder) including Supply, Handling, Transportation to site, Erection & Installation of OFC & HDPE Jointing and Blowing/Pull Pits: All civil & structural material, including removable RCC cover, with insert plates as required, seals for sealing of pits, pavement all round; finishing as per drawings and specification enclosed in the Bid document and as per direction of Engineer-In-Charge. | - | Meters |
| 7 | HDD_Videography & Phography | HDD_Videography & Phography — VIDEO FILM AND PHOTOGRAPHSPreparation of video film with audio commentary and photographs covering all aspects / activity of pipeline construction annotated as required, conversion of the same to Video CD / DVD format, submitting three(3) sets of the same as per details in Specification for Documentation for Pipeline Construction The work shall be carried out in two phases. Videography and photography of the entire route prior to construction activities i.e. pipeline route, location of various stations, TOP, all crossing like road / railways, river, etc. Videography during construction activities of Mainline Works i.e. String, Welding, Radiography, Joint Coating, Lowering, Backfilling, and all major crossings etc. performing all works as per specification, instruction of engineer-in-charge and other provision of contract document. | - | Lump Sum |
| 8 | 16" Pipeline Laying | 16" Pipeline Laying — PIPELINE LAYING/ INSTALLTION : Laying/ installation of externally coated with 3LPE, associated fittings and accessories, etc. as per specifications, drawings, other provisions of Contract and instructions of Engineer-in-Charge, including but not limited to carrying out the following: "Receiving and taking-over", handling, loading, transportation and unloading of Owner supplied externally corrosion coated pipes from designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ workshop(s)/ work- site(s) including stringing on the pipeline Right-of-Use (ROU)/ Right of way (ROW); "Receiving and takingover", handling, including loading and unloading, transportation of Owner supplied materials other than line pipe from Owner's designated place(s) of issue to worksite(s); Arrangement of all additional land required for Contractor's storage, fabrication, access for construction (other than Owner provided ROU/ROW); supply of all materials (except Owner supplied materials), consumables, equipment, labor, etc.; Staking and installation of construction markers, clearing, grubbing, grading (as required) of Right of Use/ Right ofWay; Transportation of surplus bare /coated line pipes from the dump sites / field / Contractor's yard to Owners designated storage area, including loading/ unloading /handling and carrying out all associated works like arranging for cranes, manpower, trailers, loading and unloading including providing woodensleepers, plastic sheets, etc.; preparation of material reconciliation statement Counting the number and type of trees cut in presence of DFO/concerned authorities, keeping record, handing over to concerned authorities and getting NOC etc. thereof; Trenching to all depths and to a width to accommodate the pipeline and optical fiber cable inside the HDPE conduit as specified in scope document and as per the relevant standards, specifications, etc. by excavation in all types of soils (including soft/hard rock), including blasting, chiseling or otherwise cutting etc.; providing trench padding as required with sand/ graded earth approved by Engineer-in Charge; Carrying out repairs of pipe and coating defects not attributable to Owner (i.e. defects occurring after "taking over" of pipes from Owner); Thorough internal cleaning of all pipes by suitable methods to remove debris, shots, grits etc. to the satisfaction of Engineer-in-Charge; Stringing of line pipes along ROU/ROW including providing straw bags, soft padding/sand padding; Aligning, ovality check at pipe edges before installation/laying, bending, cutting and beveling (as required) of pipes for welding and field adjustments, NDT of rebevelled area, welding, carrying out destructive/ nondestructive testing of welds as required including radiography and providing all requisite equipment, labor, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests, as required; carrying out repairs of weld joints found defective by Engineer-In-Charge, carrying out re- radiography and other nondestructive tests as required on repaired joints, etc.; Installation of pipeline at crossings which includes but not limited to asphalted road, metalled road, non- metalled road, mud road, cart track, RCC road, utilities, existing underground pipelines & cables, overhead power lines, stream, high consequential areas, brick kilns areas, installation of concrete coated pipes (wherever required) etc., by open cut in accordance with pipeline design basis document, including pre-testing as required; Coating of all field weld joints, Lowering the pipelines in trench including providing sand bag separators for parallel pipelines at the specified spacing (when applicable), providing required padding over and around the pipeline with sand/graded material approved by Engineer-In-Charge (in rocky areas), backfilling with available, approved excavated material and/or other suitable soil approved by Engineer-In-Charge; wherever required; Carrying out hydrostatic testing; including air cleaning, flushing, filling, gauging, pressurization of complete pipeline in various test sections as approved by Engineer In-Charge to the specified test pressure, providing all equipment, pumps, fittings, flanges, blind flanges, end caps, fasteners, gaskets, valves, instruments, dead weight tester, all types of pigs etc., and services, supervision, labor, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defects attributable to Contractor, retesting after rectification, successful completion of hydrotesting of pipeline (leak detection and defect verification, dewatering, swabbing, and tie-in with pipeline at either bank etc.,); All tie-ins, golden joints (wherever required), including the tie-in(s) with the pipeline / piping installed by others including cutting of test header, re- beveling as required; Carrying out all temporary, ancillary, auxiliary works and all incidental works required to make the pipeline ready for pre-commissioning; Repair of defects recorded during EGP/gauge plate run not attributable to owner or otherwise including cutting, beveling, welding, radiography, field joint coating etc.; as applicable, Construction of retention walls, wherever required; Final clean-up and restoration of right of way/right of use including obtaining NOC from respective statutory authorities and NOC from land owners after restoration as required and disposal of debris and returning all surplus material to designated disposal areas/storage yard, as directed by Engineer-In-Charge; Restoration of land, facilities and boundary wall etc. at associated facilities complying with all stipulation/conditions/recommendation of the said authorities; Preparation of as-built drawings, pipe-book and other records.Notes: -1. Rate for laying of free issued OFC and supply & laying of HDPE duct shall be quoted in relevant Schedule of Rates (SORs) are covered separately.2.The length of pipeline are tentative.3. For soft / normal soil and rocky area detailed refer enclosed Alignment Sheets and Soil Investigation Report attached with Tender.5. Rate for Magnetic Cleaning and Electronic Geometry Pigging shall be quoted separately under separate line item.SOR shall be read in conjunction with scope of work, job specific requirements, specifications, standards, drawings and other provision of contract document. All above works for buried pipeline as per following details: Contractor shall take suitable protective measures at existing U/G pipeline crossings, existing overhead power cable crossings (for 11Kv and above), existing U/G cables, existing A/G pipeline crossings by providing concrete slab/Insulating HDPE sheet along withPipeline Warning Tape as per approved drawing, above the proposed pipeline, before backfilling. Installation of Coated Line Pipes as per following details:16" Dia. 3LPE Coated Pipe, 7.14mm -12mm Wall thick., API 5L Gr X65, PSL2 Schedule 2 Manadatory: No | - | Meters |
| 1 | HDD-2_MUNNERU | HDD-2_MUNNERU — INSTALLATION OF PIPELINE ACROSS MAJOR CROSSINGS BY HDD - Munneru River, Crossing Number - CS-48 at Ch. 38+294 km Complete work of the water body crossing (between the ROW limits as defined in Crossing Drawings enclosed with Bid Document) by HDD method including "Receiving and taking over" owner supplied three layer PE/PP coated line pipes from Owner's designated place of issue/dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling loading, unloading, aligning etc. supply of all Contractor supplied material including required length of CS conduit for OFC laying of size 6"; 6.4mm thk. of A106 Gr.B/API 5L Gr.B/IS 3589/IS1239 or equivalent ERW pipe (supply & laying of HDPE and laying of free issued OFC shall be quoted separately elsewhere in the SOR) to work site(s), manpower, equipment, other resources and aquiring the required land for storage, fabrication inclduing string preparation of pipes, ovality check at pipe edges before installation/laying, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve and repair of pipeline coating with special repair patch materials as per Specification, pre-test, hardware / software required for commissioning the above system.In-situ pre-construction survey including auger bore(s) of minimum 6.0 M depth (in the middle third of waterway; at least 1 in each waterbody and at interval of 50M centres) to establish bed strata, its bore log by soil testing; obtaining historical data/ scour depth from concerned authority ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata, all depth to accommodate the pipeline and CS conduit for OFC laying at all conditions of the water crossings by HDD methods for providing with minimum cover either as indicated in Tender Documents or as required by concerned authority or site & technical requirement and In case of multiple combined crossing i.e. RiveR alongwith road/ drain, minimum cover requirement as per specification/ concerned authority for each type of crossing has also to be fulfilled.Laying of the pipeline by the approved HDD method across the water crossing including, strings preparation of pipes, welding, testing, radiography, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent and repair of pipeline coating with special PERP-80 repair patch or equivalent material as per specification, prehydrotest of complete strings made for crossing etc. Backfilling of the ditch/ trench including restoration and clean-up of area etc. to the satisfaction of Engineer-in-charge/ Concerned Authority.Post installation hydrotest dewatering and tie-in with pipeline at either banks etc.All other works including pigging, cleaning, final hydrotesting etc. including repair of defects and retesting, etc. for defects attributed to Contractor's faulty work, Supply, fabrication and construction of protective fencing as required, Restoration and clean-up etc., Preparation of as-built drawings and other records etc., required as per specification, and all other works in accrodance with approved drawings, calculations, methods and to the satisfaction of Engineer-in-charge and/ or as directed by concerned Authority.Preparation of detailed construction method statements and calculations for Owner'sApproval.Note:-1. Width of below crossings shall be as per requirement at site for crossing at different locations.2. Width of the crossings are indicated in respective Crossing drawing enclosed with the tender document. Crossing width may vary as per site condition. String length for HDD shall vary as per design calculations so that pipe is not under stress as permitted by codes/specifications. However final length of string & cover from top of pipe shall be decided and approved by concerned Authority / Engineer-in-charge.3. It is sole descretion of the Contractor to do HDD crossing of mainline pipe as well as CS conduit pipe either by suitabily strapping together both the carrier pipe & CS conduit and pulled through the same drill hole or making separate HDD(preferable seperate) for 6" CS conduit for OFC laying at minimum 4m distance apart from centreline of HDD of mainline. No separate payment for HDD for 6" CS conduit shall be paid.4. Payment for the length of final tied-in carrier pipeline string with mainline and CS conduit laid by HDD method are inclusive in the above item rate and no separate payment shall be made under other clause mentioned elsewhere.5.Pipeline Detail: Size:- Line pipe 406mm, Material:-API 5L Gr. X-65 PSL2, Coating:-3LPP/3LPE | - | Meters |
| 2 | HDD_Preservation 3 months | HDD_Preservation 3 months — IDLE TIME PRESERVATION OF PIPELINEPRESERVATION OF PIPELINE: Preservation of complete pipeline and associated facilities and its maintenance including supply of all consumables, all equipment , man-power, etc. complete as per the requirements of specifications, other provsions of Contract document and instructions of Engineer-In-Charge . By filling and pressurising with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor tomaintain the effectiveness of the inhibitor water for the following details:(Pipeline Size 16", Pressure in bar (g) - 05, Specified period - 1st to 3rd Month ).The Contractor shall be responsible for dewatering the entire line after water treatment as per the specifications and arranging required approvals from Owner,Local and statutory authorities as applicable. | - | Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000294-HD-10120.pdf
TENDER_DOCUMENT • 49.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .