Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.1 L C/o Type III 12 nos,Type IV 8 nos, Type V 4 nos, Type VI 1 no quarter and community hall i/c water supply, sanitary installations, drainage, electrical installations and development and bulk services of civil and elctrical for CSB at Gottigere, Bangalore. SH: Preparation of structural analysis, design and detailing. | C/o Type III 12 nos,Type IV 8 nos, Type V 4 nos, Type VI 1 no quarter and community hall i/c water supply, sanitary installations, drainage, electrical installations and development and bulk services of civil and elctrical for CSB at Gottigere, Bangalore. SH: Preparation of structural analysis, design and detailing. | L1 |
| Sl No | Description | Qty | Unit | INTELIJENTO DESIGNS LLP L1 |
|---|---|---|---|---|
| 1 | Structural analysis, design and detailing for the following Building, development works including proof checking from as per S.no21 and submission of 8 sets of had copies in A2/A1 Size for each building:
i) Type III quarters (G+3) plinth area of 1492 sqm
ii) Type IV quarters (G+4) plinth area of 1562 sqm
iii) Type V quarters (G+3) plinth area of 1265 sqm
iv) Type VI quarters plinth area of 269 sqm
v) UG sump, community hall, STP, 230m Rretaining wall with varying depth, compound wall and drainage | 1 | 1 | 2,09,995 ₹2,09,995 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
10 Jul 2023, 4:00 pmClosed
EE-Bangalore-II
VADDE SRINIVASULU
Executive engineer-II, CPWD, Bengaluru
C/o Type III 12 nos,Type IV 8 nos, Type V 4 nos, Type VI 1 no quarter and community hall i/c water supply, sanitary installations, drainage, electrical installations and development and bulk services of civil and elctrical for CSB at Gottigere, Bangalore. SH: Preparation of structural analysis, design and detailing.
46543
E-Quotaiton 4
OPEN
Civil Works - Buildings
NCB
15 days
Bengaluru Urban, Karnataka
4 documents required · 4 mandatory
₹15,000
Not Applicable
10 Jul 2023
3 Jul 2023
10 Jul 2023
10 Jul 2023
10 Jul 2023
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIQ+CSB+Gottigere.pdf
document • 2.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .