Tender Value
₹3.4 Cr
EMD Value
₹6.7 L
Closing Date
7 Aug 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DEN/HQ
14 conditions · 3 needing a document upload
Item no 10.2 of GCC 2022: Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause 10.2 of Indian Railways Standard General Conditions of Contract'2022 with upto date correction slip. [Authority: Executive Director/Civil Engineering(G), Railway Board's letter No.2022/CE-I/CT/GCC-2022/Policy dated 14.07.2022]
SIMILAR NATURE OF WORK FOR THIS TENDER WILL BE AS -ANY WORK INVOLVING SURVEY USING GEDO TROLLEY SYSTEM OR SIMILAR SYSTEM TO ACHIEVE DESIGNATED LINE AND LEVEL OF THE RAILWAY TRACK.
26 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Para 5(3) ii. Part I of GCC shall be read as under: The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids [i.e. excluding the last date of submission of bids] [Advance Correction Slip No.5 to Indian Railways Standard General Conditions of Contract, April 2022 vide Executive Director, Civil Engineering(G), Railway Board No.2022/CE-I/CT/GCC-2022/Policy dated 20.10.2023].
The participating Bidder must submit self certificate [Annexure V & VA as applicable] duly downloaded from the link given in Submission of Document Verification Certificate or documents uploaded along with tender. [Advance Correction Slip No.3 vide Executive Director, Civil Engineering(G), Railway Board No.2022/CE-I/CT/GCC-2022/Policy dated 26.04.2023 and Advance Correction Slip No.4 vide Executive Director, Civil Engineering(G), Railway Board No.2022/CE-I/CT/GCC-2022/Policy dated 07.08.2023 ].
Maintenance period of contract - The Earnest Money/Bid Security deposited by the contractor will be converted into Security Deposit and will be refunded after six months of the date of completion of the work in all respect to the entire satisfaction of the Railway and on receipt of a certificate from the Assistant Engineer concerned.
All documents in support of fulfillment of eligibility criteria with respect to completion of similar nature of work for Technical Eligibility Criteria and Total contract value for Financial Eligibility Criteria should be submitted/ uploaded online in the website with scanned copy at the time of tender bidding with details showing in Annexure I, IV. No post tender communication, in any form will be made or entertained, after opening of tenders, in this regard. Railways may however call for the originals of the credentials for verification or any clarifications/confirmations on the contents of the documents submitted. Eligibility of tenderers shall be decided solely of the basis of the documents submitted along with the tender offers and any subsequent document whatsoever submitted in this connection would not be given any cognizance for finalization of the tender.
Payment through Letter of Credit is applicable for this tender as per Railway Board's letter no 2017/ACII/9/10 Pt I dated 20.02.2018 & 2018/CE-I/CT/9 dt. 04.06.2018 (Annexure B & C attached).
INSTRUCTION TO BIDDERS: A] The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of his obligations or liabilities hereunder nor will it affect any rights of the railway there under. B] In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit [EMD], performance Guarantee [PG] and Security Deposit [SD] of contract forfeited and agency barred for doing business on entire Indian Railways for 5[five] years.
Shramik kalyan Contractor[s] are requested to get themselves registered on Railways Shramik kalian portal at www.shramikkalyan.indianrailways.gov.in after issuance of letter of acceptance.
Contractor(s)/ Bidders are requested to refer to Clause 46A of Indian Railways Standard General Conditions of Contract'2022 with up to date correction slip for Price Variation Clause (PVC) in works contract. Item no 46A.1 of GCC 2022: Price Variation Clause (PVC) shall be applicable only in tender having advertised value above Rs. 2 Crores. [Authority: Executive Director/Civil Engineering(G), Railway Board's letter No.2022/CE- I/CT/GCC-2022/Policy dated 14.07.2022]
For further details related to 'Bid Security' Bidders are requested to please connect para no 23 of the tender documents.
Bidders are requested to refer to para no 9 of tender document [Para 41 & 42 of Part II Standard General Conditions of Contract for "Variations in extent of Contract" of GCC 2022]
In case Agency desires submission of Bid Security in the form of Bank Guarantee, then please refer to para no 23(3) of Instruction to Tenderers for e-tenders, chapter I for further guidance. [Clause 5.0 of Part I of GCC 2022]
Bidders may also upload any relevant document as deemed fit.
GST has been considered during assessment of this instant tender. Tenderer(s) should quote rate inclusive of applicable GST.
Participants tenderer(s) are requested to go through the Railway Board letter no.2022/CE-I/CT/GCC-2022/POLICY/Pt.I(E-3320424) Dtd.13.03.2026 Indian Railways Standard General Conditions of Contract, April 2022 (Advance Correction slip No.11) which is enclosed in documents.
Improvement of Track geometry and track parameters by using Trimble GEDO Vorsys trolley system in Sealdah Division of Eastern Railway.
TN-123-26-27
TN-123-26-27
Open
Works - General
12 Months
Kolkata, West Bengal
₹0
₹6.7 L
7 Aug 2026
14 Jul 2026
24 Jul 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Pre Temping Measurements (a) Establishments of main GNSS (DGPS Base) Point & reference point establishment at 150 meter maximum interval along the track. | Kilometre | 600.00 8589.06 | 51,53,436 | — |
| 2 | Pre Temping Measurements (b) Pre measurement for tamping with total station & prism Gedo trolley measure and store Gauge, Cross elevation, Chainage, Shift and lift value at every 3m i.e. Every 5th sleeper interval along the track center line and co-ordinates of track center line at every 3m to be submitted with track geometry (per/km/round) | Kilometre | 630.00 15049.36 | 94,81,096.8 | — |
| 3 | Construct target/Designs aligment with the good points of existing pre measurement profile in design software. To xeport data in ALC format with design alignment or measured reading in M/C and to provide track adjustment file with Ver, extension and also to provide Geo Geometry file to provide text file with slew, uplift and gauge at every 3m i,e. every 5th sleeper interval for tamping machine operator during reference. (Extra quantity for length 30Km taken due to P- xing) | Kilometre | 630.00 3869.95 | 24,38,068.5 | — |
| 4 | Post Temping Measurements (a) Post Tamping measurement with total station & prism Gedo trolley measure and store Gauge, Cross elevation, Chainage, Shift and lift value at every 3m i.e. Every 5th sleeper interval along the track center line and coordinates of track center line at every 3m to be submitted with track geometry (per/km/round) (Extra quantity 50% taken dur to re- measurement for tamping) | Kilometre | 945.00 15049.36 | 1,42,21,645.2 | — |
| 5 | Reporting(a) Report & plotting soft and hard copies of slew & uplift report at every 3m/5m i.e. every 5th. Sleeper interval compared with design Vs pre profile report of offset distance from track enter to OHE, neighbouring track center & platform point. | Kilometre | 600.00 3869.95 | 23,21,970 | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-B-LOC.pdf
ATTACHMENT
SHRAMIKKALYAN.pdf
ATTACHMENT
Cesscharge.pdf
ATTACHMENT
ComlCompliance-IVVVIVIIVIIIIXXI.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
ANNEXURE-C-LOC2.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
annexureVIBcontractualturnoverdata.pdf
ATTACHMENT
annexureVIABidsecurity.pdf
ATTACHMENT
Annexure--I_a_I_b_IIIII-TechComp.pdf
ATTACHMENT
tmtbarsdecontrolled.pdf
ATTACHMENT
Annexure-V_VA.pdf
ATTACHMENT
GCCACSUPRO_10.pdf
ATTACHMENT
TenderDocumentChapterI-II.pdf
ATTACHMENT
JPODIGGING.pdf
ATTACHMENT
LetterregardingrecommendedlistofBrands_makeofmaterialsdated03.09.2025.pdf
ATTACHMENT
IRStandardGCC2022AdvanceCorrectionSlipNo11.pdf
ATTACHMENT
INDIANRAILWAYSTRACKMACHINEMANUALINCORPORATEDUPTOACS10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .