Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC | L1 | Accepted-AOC Work Awarded | |
| 2 | L2₹49.1 L+₹11.7 L (31.1%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹49.2 L+₹11.8 L (31.4%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹49.8 L+₹12.3 L (32.8%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹51.2 L+₹13.8 L (36.8%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
20 May 2021, 11:00 amClosed
Executive Engineer Salooni Division HPPWD
Executive Engineer Salooni Division HPPWD
Construction of Link Road from Birwari to Thadal km 0/0 to 3/165 (Under BASP)
2021_PWD_47395_1
No.PW-SD-GA- 670-720 dated 22.4.2021
Open Tender
Civil Works
Item Rate
180 days
Salooni
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
₹1.7 L
19 Oct 2021
11 May 2021
20 May 2021
11 May 2021
20 May 2021
11 May 2021
Amount
Excavation in hilly area in all heights and depths and in all classification of soil by manual / mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/ wedging out rock (where blasting is prohibited) and their intermediate classification of soil setting out true to the required line, grades, width cutting and trimming of side slopes and level as shown in the drawing and as directed by the Engineer-in-Charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of the road and transportation of un-useful materials for filling in road ways, camber embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load of animals transport or mechanical means along with its levelling fine dressing and hauling / carriage of machineries, material, tool equipments and safety measures. All useful material such as stone, shingles, aggregates and slates etcetra of sorted out and stacked in proper stack. Any loss to the public/ private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all case.The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government.
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 and 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness blind age and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.The rate is including royality, Malkana,Tol tax, GST or other taxes imposed by the Government.
Providing and laying of boulder apron laid in wire crates with 4 mm dia (four millimetre) diametre G.I. wire confirming to IS: 280 and IS: 4826 in 100mmx 100mm (one hundred millimetre into one hundred millimetre) (woven diagonally ) including 10 (ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 Kg (Twenty five kilogram) each as per draing and technical specifications clause 1301 incuding all leads and lifts and as per the direction of Engineer-in-Charge.The rate is including royality, Malkana,Tol tax, GST or other taxes imposed by the Government.
Back filling with granular material behind abutments, wing walls, return walls , R/wall complete as per drawing and M.O.R.D. technical specification clause 1203 and section 1604 , as per direction of Engineer-In-Charge including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect. The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Vinod Thakur
Ashiq Mohd
Narain Singh Thakur
Dildar Ali
Ramesh Thakur
Kehar Singh
construction
Narinder Thakur
HIMTECH CONSTRUCTION CO
SHAM LAL VERMA
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .