Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹4.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.0 L+₹4,464.15 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,464.15 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹5.0 L+₹4,464.15 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,464.15 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹5.0 L+₹4,464.15 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,464.15 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹5.0 L+₹4,464.15 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,464.15 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
19 Sept 2026, 5:00 pmClosed
Executive Officer,Baripada Municipality
Executive Officer,Baripada Municipality
Construction of Road from Transformer chhaka towards Pani babu house in Ward No.02
2026_ORULB_140655_2
BPDM 7 of 2026-2027
Open Tender
Civil Works - Roads
Percentage
60 days
Baripada Municipality
As per DTCN
3 documents required · 3 mandatory
₹2,000
₹5,000
Yes
21 Sept 2026
9 Sept 2026
21 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge | 8.1 | Cum | 276.89 | ₹2,242.81 |
| 2 | Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge (Unit-1 cum) | 31.05 | Cum | 1,089.3 | ₹33,822.77 |
| 3 | C.C.(1:3:6) with 40mm CBHG metal including cost,carriage and royalty of materials (Unit-1 cum) | 23.96 | Cum | 7,332.37 | ₹1,75,683.59 |
| 4 | C.C. / R.C.C. work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials | 10.13 | Cum | 7,422.26 | ₹75,187.49 |
| 5 | Rigid & smooth centering & shuttering for RCC works including false works and dismantling them after casting including cost of materials complete in ground floor | 81 | Sqm | 248.67 | ₹20,142.27 |
| 6 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP -63:2018. | 283.45 | Sqm | 662.87 | ₹1,87,890.5 |
| 7 | Cost of Photo & Signboard | 1 | Full set | 1,048 | ₹1,048 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.32 MB
BOQ_608893.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .