| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC VILLAGE GOBINDAPUR POST SONHA DISTRICT BASTI | BASTI | UTTAR PRADESH | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 CrRejected-Finance | ₹2.0 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFY WITH TECHNICAL SPECIFICATION |
| 4 | Rejected-Technical GHAZIPUR | UTTAR PRADESH | 232325 | - | - | Rejected-Technical NOT QUALIFY WITH TECHNICAL SPECIFICATION |
| Sl No | Description | Qty | Unit | M/S BALA JI ENTERPRISES L1 | M/S DEEPENDRA PAL THEKEDAR L2 |
|---|---|---|---|---|---|
| 1.00 | Laying/ Dumping of Nylon Crate (1.0x1.0x1.0M) Filled with Local earth in E.C. bags including cost of all material, labour, T&P etc. | 6,195 | Nos. | 1,066 ₹66.0 L | 1,081.54 ₹67.0 L |
| 2.00 | Supplying, filling, stitching & dumping of Geo-bag of size (1.00mx0.75m) at work site excluding all taxes but including contractor's profit with Size 1.00m*0.75m).For 1.00 Cum. Required 8 No. of Geo Bags | 19,912 | Nos. | 254.72 ₹50.7 L | 257.66 ₹51.3 L |
| 3.00 | Supply and fixing of 9mm, 4 strands Polypropelene Rope Gabion with lid & slings, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) at work site excluding all taxes but including contractor's profit. Size 1.8*1.8*0.5 | 820 | Nos. | 1,557.77 ₹12.8 L | 1,575.75 ₹12.9 L |
| 4.00 | S/F of Porcupines including cost of material labour and T&P etc. Complete | 394 | Set | 8,570 ₹33.8 L | 8,663.57 ₹34.1 L |
| 5.00 | S/L Jhanklhar/behaya for filling screen (gaps) of porcupine 60% of total volume total volume= 394x6.75x2.25= 5983.88 cum(Deduct 40% ) | 2,394 | Cum. | 443.73 ₹10.6 L | 448.85 ₹10.7 L |
| 6.00 | S/L of new empty cement bag filled with Local Earth in screen(gaps)of porcupine 40% of total volume total volume=394x6.75x2.25= 5983.88 cum(Deduct 40% ) | 29,920 | Nos. | 41.5 ₹12.4 L | 40.78 ₹12.2 L |
| 7.00 | Earth work for making river bank slope for pitching including cost of all material, labour, T&P etc. complete. | 5,542 | Cum. | 47.21 ₹2.6 L | 47.75 ₹2.6 L |
| 8.00 | Earth work in filling on slope after pitching including cost of all material, labour, T&P etc. complete. | 1,482 | Cum. | 56.65 ₹83,955.30 | 57.3 ₹84,918.60 |
| 9.00 | Supplying and laying of 200 GSM Geo taxtile Sheet for filter material before laying of Boulder Pitching around spur Nose/Shank inculding cost of all material, labour and T&P etc. Complete | 4,749 | Sqm. | 162.39 ₹7.7 L | 164.26 ₹7.8 L |
| 10.00 | Bracing with bamboo of dia 50-80mm (length of 9.00m) including tying with Nariyal rope labour, T&P required. | 1,648 | RM. | 81 ₹1.3 L | 81.18 ₹1.3 L |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
NIT05 LOT06
2026_UPIDC_1122365_6
06/SE-XI/2025-26
Open Tender
Civil Works
90 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,200
₹4.3 L
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
9 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Laying/ Dumping of Nylon Crate (1.0x1.0x1.0M) Filled with Local earth in E.C. bags including cost of all material, labour, T&P etc.
Supplying, filling, stitching & dumping of Geo-bag of size (1.00mx0.75m) at work site excluding all taxes but including contractor's profit with Size 1.00m*0.75m).For 1.00 Cum. Required 8 No. of Geo Bags
Supply and fixing of 9mm, 4 strands Polypropelene Rope Gabion with lid & slings, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) at work site excluding all taxes but including contractor's profit. Size 1.8*1.8*0.5
S/F of Porcupines including cost of material labour and T&P etc. Complete
S/L Jhanklhar/behaya for filling screen (gaps) of porcupine 60% of total volume total volume= 394x6.75x2.25= 5983.88 cum(Deduct 40% )
S/L of new empty cement bag filled with Local Earth in screen(gaps)of porcupine 40% of total volume total volume=394x6.75x2.25= 5983.88 cum(Deduct 40% )
Earth work for making river bank slope for pitching including cost of all material, labour, T&P etc. complete.
Earth work in filling on slope after pitching including cost of all material, labour, T&P etc. complete.
Supplying and laying of 200 GSM Geo taxtile Sheet for filter material before laying of Boulder Pitching around spur Nose/Shank inculding cost of all material, labour and T&P etc. Complete
Bracing with bamboo of dia 50-80mm (length of 9.00m) including tying with Nariyal rope labour, T&P required.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2089881.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
lot06document.pdf
Tender Documents • 3.04 MB
BOQ_2089881.xls
BOQ • 0.35 MB