Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance 3 6E PARK JUNCTION THIRUVARAMBU | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NISSI ELECTRICALS L1 |
|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 24 | Each | 14,400 ₹16,992 Lowest |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 24 | per pit | 18,000 ₹21,240 Lowest |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 24 | per pole | 19,200 ₹22,656 Lowest |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 24 | Each Pole | 19,200 ₹22,656 Lowest |
| 5.01 | Erection of HT side arm with stud | 2 | Each | 700 ₹826 Lowest |
| 6.01 | Erection of Guarding X arm | 4 | Each | 1,000 ₹1,180 Lowest |
| 7.01 | Erection of V X arm 4.5 feet | 28 | Each | 11,200 ₹13,216 Lowest |
| 8.01 | Fixing of HT/LT TI fittings | 23 | Each | 2,300 ₹2,714 Lowest |
| 9.01 | Erection of Tapping channel X arm | 1 | Per loc | 350 ₹413 Lowest |
| 10.01 | Fixing of HT pin insulator | 66 | Each | 4,950 ₹5,841 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,907
Closing Date
2 Sept 2026, 2:00 pmClosed
EE/TKY
TNEB TKY
Improvement estimate for improving tailend voltage in Kolvel SS II 100 KVA DT by providing 1 no proposed 63 KVA Distribution Transformer under Urban Kulasekharam Section
2026_EB_695716_1
EE/D/TKY/ETW 16/26-27,Dt.19.08.2026
Open Tender
Electrical Works
Works
90 days
EE/TKY
as specified tender
3 documents required · 3 mandatory
₹0
₹2,907
7 Sept 2026
19 Aug 2026
3 Sept 2026
20 Aug 2026
2 Sept 2026
20 Aug 2026
20 Aug 2026 - 2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 24 | Each | - | - |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 24 | per pit | - | - |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 24 | per pole | - | - |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 24 | Each Pole | - | - |
| 5.01 | Erection of HT side arm with stud | 2 | Each | - | - |
| 6.01 | Erection of Guarding X arm | 4 | Each | - | - |
| 7.01 | Erection of V X arm 4.5 feet | 28 | Each | - | - |
| 8.01 | Fixing of HT/LT TI fittings | 23 | Each | - | - |
| 9.01 | Erection of Tapping channel X arm | 1 | Per loc | - | - |
| 10.01 | Fixing of HT pin insulator | 66 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 1.53 MB
BOQ_836514.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .