Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | -25.10% | ₹4.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.4 L+₹64,349.95 (13.5%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹5.4 L+₹64,349.95 (13.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.4 L
EMD Value
₹6,400
Closing Date
7 Sept 2026, 3:00 pmClosed
ZONAL OFFICER
ZONE-X
Road Cut Restoration Made by CMWSSB Department at 67th Street Ashok Nagar in Div-135, Unit-31, Zone-10
2026_CoC_698453_1
Z.O.X.C.No.E1/KKM/9197/02/2026
Open Tender
Civil Works
Works
KODAMBAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,400
7 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With In...mall Size Boulders And Hard Gravelly Soil (SS 20A) | 90 | CUM | 156.4 | ₹14,076 |
| 2 | Conveyance by roads in plains 0 to 10 km including Loading unloading and transportation charges | 90 | CUM | 225 | ₹20,250 |
| 3 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 60 | CUM | 2,709.1 | ₹1,62,546 |
| 4 | Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials) | 24 | CUM | 9,749.66 | ₹2,33,991.84 |
| 5 | Cold Milling of Existing Asphalt Pavement to a Required Depth And The Milled Surface To Be Cleaned. | 9 | CUM | 3,277.09 | ₹29,493.81 |
| 6 | Conveyance Charges for milling materials to the work site to designated dumping yard | 9 | CUM | 393.75 | ₹3,543.75 |
| 7 | Providing and laying Tack coat over the existing b...able only if the Work is carried out during NIGHT) | 300 | SQM | 35.56 | ₹10,668 |
| 8 | Providing And Laying Tackcoat Over The Existing Co...able Only If The Work Is Carried Out During Night) | 120 | SQM | 22.8 | ₹2,736 |
| 9 | Providing and laying Bituminous Concrete to 30 mm ...ble Only If The Work Is Carried Out During Night). | 420 | SQM | 379.03 | ₹1,59,192.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_839557.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .