Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | ₹4.0 L Quoted ₹3.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 L+₹12,319.12 (3.66%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹3.5 L+₹12,319.12 (3.66%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of DGC Copper Strip 5.00 mm | 60 | Coil | 5,381.68 ₹3,22,900.74 Lowest | 5,577.94 ₹3,34,676.4 |
| 2.00 | Insulation cost @ 15% | 1 | Job. | 48,435.11 ₹48,435.11 Lowest | 50,201.46 ₹50,201.46 |
| 3.00 | Labour cost @ 15% | 1 | Job. | 48,435.11 ₹48,435.11 Lowest | 50,201.46 ₹50,201.46 |
| 4.00 | Less scrap value @ 60% of wire cost | 188 | Kg. | 658.98 ₹-1,23,888.24 Lowest | 682.8 ₹-1,28,366.4 |
| 5.00 | Cost of one Lid with Lug and other req. meterials | 3 | No. | 3,330 ₹9,990 Lowest | 3,453 ₹10,359 |
| 6.00 | Add Profit | 1 | No. | 30,587.27 ₹30,587.27 Lowest | 31,707.19 ₹31,707.19 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - |
Tender Value
₹3.7 L
EMD Value
₹4,600
Closing Date
7 Apr 2026, 6:00 pmClosed
Project Engineer (EnM), Urimari OCP
Office of The Project Engineer (EnM), Urimari OCP, Barka Sayal Area, Pin 825311
Repairing and rewinding of 235 KW, 3.3KV, 3-Phase, Marathon make Sr.No.3F33116511 HT Induction Motor under Urimari OCP.
2026_CCL_357650_1
PE(EnM)/Urimari/e Tender/25-26/50
Open Tender
Electrical and Maintenance Works
Item Wise
25 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹4,600
2 Aug 2026
27 Mar 2026
8 Apr 2026
28 Mar 2026
7 Apr 2026
28 Mar 2026
28 Mar 2026 - 3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cost of DGC Copper Strip 5.00 mm | |||||
| 2Insulation cost @ 15% | |||||
| 3Labour cost @ 15% | |||||
| 4Less scrap value @ 60% of wire cost | |||||
| 5Cost of one Lid with Lug and other req. meterials | |||||
| 6Add Profit | |||||
| 7Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_370519.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .