Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance 0 ADITYA ENTERPRISES 0 UNNAO HARDOI ROAD KISHORI KHERA UNNAO UTTAR PRADESH UNDER NAGAR PALIKA UNNAO UTTAR PRADESH 209801 | UNNAO | UTTAR PRADESH | 209801 | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 LAdmitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹3.5 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of DGC Copper Strip 5.00 mm | 60 | Coil | 5,381.68 ₹3.2 L | 5,577.94 ₹3.3 L |
| 2.00 | Insulation cost @ 15% | 1 | Job. | 48,435.11 ₹48,435.11 | 50,201.46 ₹50,201.46 |
| 3.00 | Labour cost @ 15% | 1 | Job. | 48,435.11 ₹48,435.11 | 50,201.46 ₹50,201.46 |
| 4.00 | Less scrap value @ 60% of wire cost | 188 | Kg. | 658.98 -₹1,23,888.24 | 682.8 -₹1,28,366.40 |
| 5.00 | Cost of one Lid with Lug and other req. meterials | 3 | No. | 3,330 ₹9,990 | 3,453 ₹10,359 |
| 6.00 | Add Profit | 1 | No. | 30,587.27 ₹30,587.27 | 31,707.19 ₹31,707.19 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - |
Tender Value
₹3.7 L
EMD Value
₹4,600
Closing Date
7 Apr 2026, 6:00 pmClosed
Project Engineer (EnM), Urimari OCP
Office of The Project Engineer (EnM), Urimari OCP, Barka Sayal Area, Pin 825311
Repairing and rewinding of 235 KW, 3.3KV, 3-Phase, Marathon make Sr.No.3F33116511 HT Induction Motor under Urimari OCP.
2026_CCL_357650_1
PE(EnM)/Urimari/e Tender/25-26/50
Open Tender
Electrical and Maintenance Works
25 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹4,600
9 May 2026
27 Mar 2026
8 Apr 2026
28 Mar 2026
7 Apr 2026
28 Mar 2026
28 Mar 2026 - 3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cost of DGC Copper Strip 5.00 mm | |||||
| 2Insulation cost @ 15% | |||||
| 3Labour cost @ 15% | |||||
| 4Less scrap value @ 60% of wire cost | |||||
| 5Cost of one Lid with Lug and other req. meterials | |||||
| 6Add Profit | |||||
| 7Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_370519.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid