Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 403 VIPIN KUMAR CONTRACTOR ADHAUN ADHAUN NEAR JAT PARK KURUKSHETRA KURUKSHETRA HARYANA KURUKSHETRA 136119 INDIA | KURUKSHETRA | HARYANA | 136119 | ₹1.7 L Quoted ₹1.0 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹1.5 LRejected-AOC HARYANA HR | SONIPAT | HARYANA | 131001 | ₹1.5 L | L2 | Rejected-AOC 2nd Lowest |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
12 Mar 2026, 10:15 amClosed
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Prov Lay Cutting Jointing of SW Pipe Line 250mm dia and Construction of Sewer Manhole and Manhole Cover Back side of Tau Devi Lal Stadium and Pet Hospital in Sector 3 Panchkula
2026_HBC_506837_1
2026778F08C5 5133 4AC6 B9F1 4A035CB8F766269HSV
Open Tender
Civil Works
30 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
₹3,380
Yes
18 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
6 Mar 2026 - 12 Mar 2026
4.12.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil.
11.5.3:- 12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
10.100.2 Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 40 mm size in foundation and plinth.
7.21.2 Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar. 1:6 (1 cement: 6 coarse sand)
21.93.2:- Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineerin-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening [Through Rate]
21.94.4:- Providing salt glazed stone ware pipes grade ‘A’ in standard length of 600 mm each pipe marked with IS: 651 and their lowering, cutting, jointing and testing as described in item No. 21.38, 21.39, item 21.40 including the cost of jointing materials as well as carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction of Engineer-in-charge. 4. 250mm i/d [Through Rate]
6.14.2:- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
6.33.6:- Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Cold twisted bars.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_585588.xls
BOQ • 0.25 MB
AD0152522.pdf
Additional Documents • 2.79 MB
OT0152522.pdf
Other Document • 0.09 MB
Download all tender documents and submit your bid