Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC PANDAVESWAR BARDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | ₹3.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹3.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.2 LRejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹3.2 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ANIESH KHAN L1 | SABIR CONSTRUCTION L3 | NANDI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Dismantling, shifting and installation of existing 4 stage centrifugal pump at 44L/2 Dip as per water level during post monsoon season at Pit No. 2 under Pandaveswar Colliery. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Dismantling of Pluro-II make, 4 stage, 500 GPM centrifugal pump, bend, Bedplate, motor etc (For 3 times complete shifting to new place) | 42 | Manshift | 1,330.39 ₹55,876.38 | 1,380 ₹57,960 | 1,365.75 ₹57,361.5 |
| 1.02 | Dismantling of suction pipe, foot valve, suice valve, NRV(For 3 times complete shifting to new place) | 36 | Manshift | 1,330.39 ₹47,894.04 | 1,380 ₹49,680 | 1,365.75 ₹49,167 |
| 1.03 | Transportation of dismantled Pump, motor, bedplate, Bend, NRV, Foot valve(For 3 times complete shifting to new place) | 48 | Manshift | 1,280.95 ₹61,485.6 | 1,325 ₹63,600 | 1,310.2 ₹62,889.6 |
| 1.04 | Fitting of the said complete Pump new proposed place as per current requirement(For 3 times complete shifting to new place) | 66 | Manshift | 1,330.39 ₹87,805.74 | 1,325 ₹87,450 | 1,310.2 ₹86,473.2 |
| 1.05 | Nut Bolts, Washer etc(For 3 times complete shifting to new place) | 3 | Jobs | 2,660.78 ₹7,982.34 | 3,000 ₹9,000 | 2,700 ₹8,100 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
8 Dec 2025, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Dismantling, shifting and installation of existing 4 stage centrifugal pump at 44L/2 Dip as per water level during post monsoon season at Pit No. 2 under Pandaveswar Colliery
2025_ECL_348270_1
GM-PND/EandM/25-26/186/998 dated 27/11/2025
Open Tender
Electrical and Maintenance Works
30 days
Pandaveswar Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,900
15 Jan 2026
28 Nov 2025
9 Dec 2025
28 Nov 2025
8 Dec 2025
28 Nov 2025
28 Nov 2025 - 1 Dec 2025
Amount
Dismantling, shifting and installation of existing 4 stage centrifugal pump at 44L/2 Dip as per water level during post monsoon season at Pit No. 2 under Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Dismantling of Pluro-II make, 4 stage, 500 GPM centrifugal pump, bend, Bedplate, motor etc (For 3 times complete shifting to new place)
Dismantling of suction pipe, foot valve, suice valve, NRV(For 3 times complete shifting to new place)
Transportation of dismantled Pump, motor, bedplate, Bend, NRV, Foot valve(For 3 times complete shifting to new place)
Fitting of the said complete Pump new proposed place as per current requirement(For 3 times complete shifting to new place)
Nut Bolts, Washer etc(For 3 times complete shifting to new place)
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE (BID ID -1200981)
SABIR CONSTRUCTION (BID ID -1200991)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_360986.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid