| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC low | |
| 2 | L2₹9.3 L+₹2,061.48 (0.22%)Rejected-Finance | L2 | Rejected-Finance HIGH |
| Sl No | Description | Qty | Unit | SPD Constructions L2 | M.ANNAMALAI L1 |
|---|---|---|---|---|---|
| 1.00Providing Paver Block Road at ADC Street in S.Navalpakkam Panchayat | |||||
| 2.00 | Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A. | 19.85 | Cu.m | 120 ₹2,382 | 112 ₹2,223.2 Lowest |
| 3.00 | Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification. | 11.34 | Cu.m | 5,000 ₹56,700 | 4,924 ₹55,838.16 Lowest |
| 4.00 | Centering and shuttering for sides including cost and convayance and labour charges etc complete. | 189 | Sqm | 320 ₹60,480 | 318 ₹60,102 Lowest |
| 5.00 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 21.74 | Cu.m | 6,300 ₹1,36,962 | 6,284 ₹1,36,614.16 Lowest |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 62.18 | Cu.m | 1,711 ₹1,06,389.98 Lowest | 1,711 ₹1,06,389.98 Lowest |
| 7.00 | Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 60 mm thickness paver block | 621.81 | Cu.m | 683 ₹4,24,696.23 Lowest | 683 ₹4,24,696.23 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,41,770 ₹1,41,770 | 1,41,455 ₹1,41,455 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,430
Closing Date
11 Mar 2024, 6:00 pmClosed
BlockDevelopmentOfficer(V.Pt), VandavasiBlock,
BlockDevelopmentOfficer(V.Pt), VandavasiBlock,
Providing Paver Block Road at ADC Street in S.Navalpakkam Panchayat in Vandavasi Block of Tiruvannamalai District under AGAMT 2024-2025
2024_RDTN_438104_1
1246/2024/A13-1 Dt28.02.2024 Navalpakkam Paver
Open Tender
Civil Works
Lump-sum
180 days
BlockDevelopmentOfficer(V.Pt), VandavasiBlock
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,430
Yes
2 Sept 2025
4 Mar 2024
11 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
Amount
Providing Paver Block Road at ADC Street in S.Navalpakkam Panchayat
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 60 mm thickness paver block
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPD Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .