| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹6.8 CrAccepted-AOC 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | ₹6.8 Cr Quoted ₹7.0 Cr | L 1 | Accepted-AOC L 1 |
| 2 | L 2₹7.2 Cr+₹25.0 L (3.60%)Rejected-Finance H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹7.2 Cr+₹25.0 L (3.60%) | L 2 | Rejected-Finance L 2 |
| 3 | L 3₹7.4 Cr+₹47.5 L (6.84%)Rejected-Finance NEAR SHIV MANDIR VILLAGE RAJPURA KHARKARI TEHSIL AND DISTRICT BHIWANI 127031 | BHIWANI | HARYANA | 127031 | ₹7.4 Cr+₹47.5 L (6.84%) | L 3 | Rejected-Finance L 3 |
| 4 | L 4₹9.6 Cr+₹2.7 Cr (38.1%)Rejected-Finance HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹9.6 Cr+₹2.7 Cr (38.1%) | L 4 | Rejected-Finance L 4 |
| 5 | Not Admitted-Fee/PreQual/Technical HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MAHA LAXMI CONSTRUCTION COMPANY L4 | M/S SHREE BALAJI BUILDERS L1 | Kulbir Singh Contractor L2 | Ravinder Sharma Contractor L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Credit for old bricks | 28,205.76 | Each | 2 ₹-56,411.52 | 3 ₹-84,617.28 | 2.5 ₹-70,514.4 | 1.5 ₹-42,308.64 Lowest |
| 2.00 | Raw Water Pump set : Supply erection, Testing and commissioning of Horizontal Motor Pumping Set for Raw Water having head as per indicating requirement of discharge in LPM and power capacity in BHP as per IS marked complete in all respect
750 LPM x 12.00 Mtr Head = 5.00 BHP | 1 | Each | 12,50,000 ₹12,50,000 | 90,000 ₹90,000 | 1,05,000 ₹1,05,000 | 50,000 ₹50,000 Lowest |
| 3.00 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 1.00 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG).. | 1 | Per job | 1,80,00,000 ₹1,80,00,000 | 92,00,000 ₹92,00,000 | 90,00,000 ₹90,00,000 Lowest | 90,00,000 ₹90,00,000 Lowest |
| 4.00 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 0.50 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG). | 1 | Job | 1,25,00,000 ₹1,25,00,000 | 78,00,000 ₹78,00,000 | 70,00,000 ₹70,00,000 Lowest | 70,00,000 ₹70,00,000 Lowest |
| 5.00 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)
DOL Starter :-
1.Main MCCB(ABB/LandT/
SCHNEIDER), Controlling MCB - 2nos
2.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01nos
3. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 01nos
4. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS) - 1each
5. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos
6. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos
7. CT RATIO - 100/5 (AE/KAPPA/LandT)
8. CAPACITOR BANK AS PER LOAD REQUIREMENT
9. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS)
10. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB)
11. SINGLE PHASE PREVENTER(SECURE/SELEC/TECHNO/ABB)
750 LPM x 12.00 mtr Head = 5 BHP | 1 | Each | 70,000 ₹70,000 | 35,000 ₹35,000 | 60,000 ₹60,000 | 20,000 ₹20,000 Lowest |
| 6.00 | Operation and Maintenance for complete scope of work mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/ Mtc. estimate complete in all respect as per Approved NIT.
(i) During defect liability period (Operation only) after 3 month
Trial run period. | 1 | Job | 6,00,000 ₹6,00,000 | 8,35,000 ₹8,35,000 | 10,00,000 ₹10,00,000 | 4,00,000 ₹4,00,000 Lowest |
| 7.00 | (ii) During 1st year after defect Liability period. | 1 | Job | 6,00,000 ₹6,00,000 | 9,35,000 ₹9,35,000 | 10,00,000 ₹10,00,000 | 5,00,000 ₹5,00,000 Lowest |
| 8.00 | (iii) During 2nd year. | 1 | Job | 6,00,000 ₹6,00,000 | 10,35,000 ₹10,35,000 | 10,00,000 ₹10,00,000 | 5,00,000 ₹5,00,000 Lowest |
| 9.00 | (iv) During 3rd year. | 1 | Job | 6,00,000 ₹6,00,000 | 10,35,000 ₹10,35,000 | 10,00,000 ₹10,00,000 | 5,00,000 ₹5,00,000 Lowest |
| 10.00 | (v) During 4th year. | 1 | Job | 6,00,000 ₹6,00,000 | 11,35,000 ₹11,35,000 | 10,00,000 ₹10,00,000 | 5,00,000 ₹5,00,000 Lowest |
Tender Value
₹8.4 Cr
EMD Value
₹16.9 L
Closing Date
18 Jun 2026, 10:00 amClosed
VIKAS DHANKHAR
Tosham PHED
Estimate for Aug./Renovation of water supply Sagwan 1st and Sagwan 2nd and providing and laying of distribution system
2026_HRY_527983_1
20268D63C1FE 7C3D 444D 8F78 CCEC539A6228551PUH
Open Tender
Civil Works
Works
365 days
SAGBAN
Eligiblity Crieteria
2 documents required · 2 mandatory
₹20,000
₹16.9 L
Yes
7 Sept 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
11 Jun 2026 - 18 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Credit for old bricks | 28,205.76 | Each | - | - |
| 2 | Raw Water Pump set : Supply erection, Testing and commissioning of Horizontal Motor Pumping Set for Raw Water having head as per indicating requirement of discharge in LPM and power capacity in BHP as per IS marked complete in all respect
750 LPM x 12.00 Mtr Head = 5.00 BHP | 1 | Each | - | - |
| 3 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 1.00 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG).. | 1 | Per job | - | - |
| 4 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 0.50 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG). | 1 | Job | - | - |
| 5 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)
DOL Starter :-
1.Main MCCB(ABB/LandT/
SCHNEIDER), Controlling MCB - 2nos
2.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01nos
3. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 01nos
4. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS) - 1each
5. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos
6. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos
7. CT RATIO - 100/5 (AE/KAPPA/LandT)
8. CAPACITOR BANK AS PER LOAD REQUIREMENT
9. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS)
10. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB)
11. SINGLE PHASE PREVENTER(SECURE/SELEC/TECHNO/ABB)
750 LPM x 12.00 mtr Head = 5 BHP | 1 | Each | - | - |
| 6 | Operation and Maintenance for complete scope of work mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/ Mtc. estimate complete in all respect as per Approved NIT.
(i) During defect liability period (Operation only) after 3 month
Trial run period. | 1 | Job | - | - |
| 7 | (ii) During 1st year after defect Liability period. | 1 | Job | - | - |
| 8 | (iii) During 2nd year. | 1 | Job | - | - |
| 9 | (iv) During 3rd year. | 1 | Job | - | - |
| 10 | (v) During 4th year. | 1 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_606980.xls
BOQ • 0.27 MB
777956Z160529.pdf
Additional Documents • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .