Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹19,705
Closing Date
11 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CONSTRUCTION OF P WALL AND FENCING AROUND GRAVEYARD RAZVI ABAD AND GRAVEYARD OF SYED ALI SHAH RIZVI RESHIPORA BUDGAM
2026_RDPR_305318_2
NIT_141_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
BUDGAM
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹19,705
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work :- Construction of P wall and fencing arround graveyard Razvi aabad and Graveyard of Syed Ali Shah Rizvi Reshipora Budgam
Contract No and date : As per eNIT (F:Y: 2025-26) Adv cost =Rs 3.942 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0_) Providing/Laying Stone soling Nallah/RBM/Plum hand packed on level in foundation trenches including carriages of Stones BI01010001010000000000000515BI0100001116 Cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate BI01010001010000000000000515BI0100001117 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Centering and shuttering including strutting, propping etc. and removal of form work for plinth,columns etc. BI01010001010000000000000515BI0100001118 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. BI01010001010000000000000515BI0100001119 Kg _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and fixing G.I chain link fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts, bolts, and washers as required complete as per directions of Engineer in charge Made of G.I wire 2mm dia and also includes, priming coat and 2 coats of paint BI01010001010000000000000515BI0100001120 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) 12 mm thick pluster in 1:6 mix cement mortar BI01010001010000000000000515BI0100001121 Sqm _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carriage of Stone aggregate for 20 kmts BI01010001010000000000000515BI0100001122 Cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carriage of Sand for 10 kmts BI01010001010000000000000515BI0100001123 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Add provisions for signboard, Photographes ,carriage of cement ,steel and other unforseen items. BI01010001010000000000000515BI0100001124 No Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_991659.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .