Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAdmitted-Finance | ₹18.3 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Balance Sheet for three year not enclosed |
| Sl No | Description | Qty | Unit | Kamalam Construction L1 |
|---|---|---|---|---|
| 1.00Material and Labour Charges | ||||
| 1.01 | Clearing light jungles including uprooting and removing the jungles away from the site including labour charges,tools, lead, lift,etc.,complete. | 300 | M2 | 1,725 ₹2,035.5 |
| 1.02 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth including labour and tools etc., complete. | 193 | M3 | 14,197.08 ₹16,752.55 |
| 1.03 | Supply and Filling with Msand for foundation and basement including cost of filling M-sand lead, lift, labour for filling, watering, well ramming etc., complete. | 13 | M3 | 20,895.94 ₹24,657.21 |
| 1.04 | Plain cement concrete (PCC)1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete as per standard specification. | 17 | M3 | 84,559.7 ₹99,780.45 |
| 1.05 | Reinforced cement concrete(RCC Raft works)with M25 (1:1:2) grade concrete using 12 to 20 mm HBG machine crushed metal including cost of cement, all materials, labour, laying, finishing, all leads, lifts, etc., complete. (but excluding cost of shuttering and steel reinforcement.) | 65 | M3 | 4,90,266.4 ₹5,78,514.35 |
| 1.06 | Reinforced cement concrete RCC with M25 (1:1:2) grade concrete, using 12 mm to 20mm HBS metal (machine crushed) for RCC wall with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete (but excluding cost of steel reinforcement). | 22 | M3 | 3,21,805.66 ₹3,79,730.68 |
| 1.07 | Supplying and fabricating and placing in position of RTS steel reinforcement (Fe500) for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete. | 6.69 | Ton | 5,16,864.11 ₹6,09,899.65 |
| 1.08 | Refilling with excavated soil (other than sand) for filling in foundation and basement including cost of filling excavated soil lead, lift, labour for filling, watering, well ramming etc., complete. | 16 | M3 | 614.56 ₹725.18 |
| 1.09 | Spreeding and levelling the excavated soil in layer of not more than 15cm thick for a level surface in the yard including cost of filling excavated soil, Consolidated by using power roller (hire charges for machineries) watering, well ramming, lead, lift, labour for filling,etc., complete. | 177 | M3 | 13,597.14 ₹16,044.63 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
9 Dec 2025, 2:00 pmClosed
SE/VEDC/Villupuram
no 10 power house road East pondy road villupuram
Construction of 1 No (Tank 2) twin type RCC curing tank for curing 9.0 m PSC Pole at Poothamedu PSC yard in Villupuram EDC
2025_EB_626196_1
ET09/2025-26 dt.24.11.2025
Open Tender
Civil Works
90 days
villupuram
BQR,EMD,GST
2 documents required · 2 mandatory
₹100
Yes
₹23,000
Yes
19 Jan 2026
25 Nov 2025
10 Dec 2025
25 Nov 2025
9 Dec 2025
25 Nov 2025
25 Nov 2025 - 9 Dec 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.90 MB
BOQ
BOQ • 0.31 MB
Download all tender documents and submit your bid