| Sl No | Description | Qty | Unit | G.Periyasamy H1 | ANBE SIVAM CONSTRUCTIONS H2 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 2,797 | M2 | 24 ₹67,128 | 23.3 ₹65,170.1 Lowest |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 848 | M3 | 2,516 ₹21,33,568 | 2,395.9 ₹20,31,723.2 Lowest |
| 3.00 | Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 8,476 | M2 | 90 ₹7,62,840 | 85.65 ₹7,25,969.4 Lowest |
| 4.00 | Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 8,476 | M2 | 21 ₹1,77,996 | 19.5 ₹1,65,282 Lowest |
| 5.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 424 | M3 | 11,011 ₹46,68,664 | 10,486.5 ₹44,46,276 Lowest |
| 6.00 | Providing and laying 40mm compacted thick Bituminous Concrete using 0.13 cum of 19.00-9.50mm mm IRC size HBG metal 0.17 cum of 9.50-2.36 mm IRC size HBG metal, 0.26cum of 2.36mm and blow with 47.28Kgs of VG30(60/70Bulk ) Bitumen and 3.02 Kgs Shreaded Plastic Waste for premixing per 10 sq.m including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 tonnes capacity conveying the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc., including labor for loading bitumen into bitumen tank and metal to feeder unit labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler tipper trucks, paver finisher,vibratory rollers etc., complete as per specificatio | 255 | M3 | 11,595 ₹29,56,725 | 11,042.5 ₹28,15,837.5 Lowest |
| 7.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12) | 203 | M2 | 935 ₹1,49,600 | 890 ₹1,42,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
22 Jan 2026, 3:00 pmClosed
Executive officer Andipatti Town Panchayat
Executive officer Andipatti Town Panchayat
Strengthening of Road at ward Thiruvalluvar colony East 3rd street Jampulpputhu Main Path 1 Jampulpputhu Main Path 2 4TH WARD KUMARAPURAM 5th Cross street 7TH WARD CHETIYAR PETAI Street Balaji Nagar West 1Cross Street at Andipatty Town Panchayath
2026_DTP_642095_1
815-2025
Open Tender
Civil Works
Works
Strengthening of Road at ward Thiruvalluvar colon
Pls refer tender Documents
3 documents required · 3 mandatory
₹0
₹1.2 L
Yes
Executive officer Andipatti Town Panchayat
2 Mar 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
14 Jan 2026
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying 40mm compacted thick Bituminous Concrete using 0.13 cum of 19.00-9.50mm mm IRC size HBG metal 0.17 cum of 9.50-2.36 mm IRC size HBG metal, 0.26cum of 2.36mm and blow with 47.28Kgs of VG30(60/70Bulk ) Bitumen and 3.02 Kgs Shreaded Plastic Waste for premixing per 10 sq.m including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 tonnes capacity conveying the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc., including labor for loading bitumen into bitumen tank and metal to feeder unit labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler tipper trucks, paver finisher,vibratory rollers etc., complete as per specificatio
Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.04 MB
BOQ_769077.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .