| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹1.6 L (0.55%)Admitted-Finance GORUBANDHA MISSAMARI 784 506 | SONITPUR | ASSAM | 784506 | ₹2.9 Cr+₹1.6 L (0.55%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified as per Clause 33.2a of ITB and Sec-IV 2A, 33.2a of ITB and Sec-IV 2A b, ITB 11.1. ix J of Section III BDS |
| 4 | Rejected-Technical NAYAN JYOTI TALUKDAR SORBHOG PO SORBHOG PS SORBHOG DISTRICT BARPETA PIN 781317 | BARPETA | ASSAM | 781317 | - | - | Rejected-Technical Technically Not Qualified as per Clause 33.2a of ITB and Sec-IV 2A |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified due to non submission of hard documents |
| Sl No | Description | Qty | Unit | KUSHAN CHOUDHURY L1 | M/S SUNRISE ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Repair & Renovation | |||||
| 1.01 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead of area 3 sq. metres and below.
A) Door | 97 | Each | 367 ₹35,599 Lowest | 367 ₹35,599 Lowest |
| 1.02 | B) Windows | 291 | Each | 367 ₹1,06,797 Lowest | 367 ₹1,06,797 Lowest |
| 1.03 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 389.94 | cum | 2,000 ₹7,79,880 Lowest | 2,000 ₹7,79,880 Lowest |
| 1.04 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of G.S. Sheet. | 3,492 | sqm | 150 ₹5,23,800 Lowest | 160 ₹5,58,720 |
| 1.05 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead for wall. | 9,343.04 | sqm | 40 ₹3,73,721.6 Lowest | 40 ₹3,73,721.6 Lowest |
| 1.06 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 under floor | 3,894.55 | cum | 550 ₹21,42,002.5 Lowest | 550 ₹21,42,002.5 Lowest |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 20 mm nominal sizederived from natural sources)under floor | 291.97 | cum | 6,800 ₹19,85,396 Lowest | 6,800 ₹19,85,396 Lowest |
| 1.08 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand)Wall | 2,369.71 | sqm | 850 ₹20,14,253.5 Lowest | 850 ₹20,14,253.5 Lowest |
| 1.09 | 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) | 16,839.2 | sqm | 350 ₹58,93,720 Lowest | 350 ₹58,93,720 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
27 Jul 2026, 2:00 pmClosed
Chief Engineer, PWD (Bldg)Assam, Chandmari, Guwaha
O/o the Chief Engineer, PWD (Bldg)Assam, Chandmari, Guwahati-3
Recovery and Reconstruction 97 nos of severely damaged AWCs approved under PDNA 2022 of Barpeta District
2026_PWBNH_52964_1
NIT No. CEB/MECH/16/2026/2 dtd. 23/06/2026
Open Tender
Civil Works - Building
Item Rate
240 days
Barpeta District
As per Tender Document
3 documents required · 3 mandatory
₹5,820
Yes
₹5.8 L
Yes
O/o the CE,PWD(Bldg)Assam, Chandmari, Guwahati-03
2 Sept 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
27 Jul 2026
15 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair & Renovation | |||||
| 1.01 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead of area 3 sq. metres and below.
A) Door | 97 | Each | 1.25 | ₹121.25 |
| 1.02 | B) Windows | 291 | Each | - | - |
| 1.03 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 389.94 | cum | 100 | ₹38,994 |
| 1.04 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of G.S. Sheet. | 3,492 | sqm | 53 | ₹1,85,076 |
| 1.05 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead for wall. | 9,343.04 | sqm | 10 | ₹93,430.4 |
| 1.06 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 under floor | 3,894.55 | cum | 11 | ₹42,840.05 |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 20 mm nominal sizederived from natural sources)under floor | 291.97 | cum | - | - |
| 1.08 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand)Wall | 2,369.71 | sqm | 100 | ₹2,36,971 |
| 1.09 | 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) | 16,839.2 | sqm | 53 | ₹8,92,477.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_83512.xls
BOQ • 0.40 MB
SBD92.pdf
Tender Documents • 9.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .