Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC 00 DHAPALIPURWA POST SHEKHDAHIRX BAHRAICH BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | L1 | Accepted-AOC stood L1 | |
| 2 | L2₹5.2 L+₹3.3 L (176.1%)Accepted-AOC 30 2 KIBE COMPOUND INDORE 452001 | INDORE | INDORE | MADHYA PRADESH | 452001 | L2 | Accepted-AOC stood L2 | |
| 3 | L3₹7.8 L+₹5.9 L (311.2%)Rejected-Finance PLOT NO 9 INFRONT OF PROJECT GATE NEAR HOTEL TRIMURTI NIMBLORA BK DEEPNAGAR TAL BHUSAWAL JALGAON 425307 | JALGAON | JALGAON | MAHARASHTRA | 425307 | L3 | Rejected-Finance stood L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Due to non-submission of desired documents to fulfil the PQR as per PQR clause 6(b) | |
| 5 | Rejected-Technical | - | Rejected-Technical Due to non-submission of desired documents to fulfil the PQR as per PQR clause 6(b) |
| Sl No | Description | Qty | Unit | SANROZ TECHNOLOGIES L2 | National Enterprises L1 | SHIV SHAKTI TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00spares for hydrogen compressor make: Beijing yitong | ||||||
| 1.01 | Suction and Discharge valve (1st and Second Stage) (1 set = 02 Nos valves for each stage) | 2 | Set | 1,80,000 ₹2,12,400 | 1,66,546 ₹1,96,524.28 | 1,60,550 ₹1,89,449 Lowest |
| 1.02 | Relief unloader assembly (1st Stage/2nd stage) | 2 | Nos | 54,400 ₹64,192 | 51,354 ₹60,597.72 Lowest | 2,47,500 ₹2,92,050 |
| 1.03 | Oil pump | 1 | Nos | 1,91,350 ₹2,25,793 | 1,79,986 ₹2,12,383.48 Lowest | 2,11,200 ₹2,49,216 |
Tender Value
₹8.1 L
EMD Value
₹16,300
Closing Date
16 Jan 2023, 3:30 pmClosed
D mahajan
O/o(P and W),SSTPP,Dongalia
Procurement of spares for hydrogen compressor make Beijing yitong installed at Hydrogen Generation Plant,TMD OS area at 2x600 MW,Unit 1 and 2,SSTPP,MPPGCL Dongalia
2022_MPPGC_231599_1
PT-2127
Open Tender
Miscellaneous Goods
Item Wise
60 days
O/o(P and W), SSTPP, Dongalia
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
Yes
₹16,300
Yes
30 Oct 2025
23 Dec 2022
19 Jan 2023
23 Dec 2022
16 Jan 2023
23 Dec 2022
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .