Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.2 L+₹37,436.83 (2.93%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Name of the work not mentioned on CDR |
Tender Value
₹18.8 L
EMD Value
₹37,600
Closing Date
15 Oct 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
C0NSTT 0F R/WALL AL0NG GULSHAN C0L0NY NEAR BHAT SAHIB IN PYTBAJALTA, BL0CK NAGR0TA -PART A AND PART B UNDER HEAD UT CAPEX BUDGET (C0MMUNITY DEVEL0PMENT) F0R THE YEAR 2026-27
2026_RDPR_327777_2
e-NIT No. 698 REWJ of 2026-27 dated 10-10-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹37,600
17 Oct 2026
10 Oct 2026
16 Oct 2026
10 Oct 2026
15 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | 196.54 | cum | 256.85 | ₹50,481.3 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 7.85 | cum | 4,826.5 | ₹37,888.03 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 112 | cum | 5,733.6 | ₹6,42,163.2 |
| 4 | supply and dumping of stone | 65.94 | cum | 937.6 | ₹61,825.34 |
| 5 | Centering and shuttering including strutting,propping etc and removal of form work | 120 | sqm | 286.35 | ₹34,362 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 128 | sqm | 628.95 | ₹80,505.6 |
| 7 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 471.25 | cum | 371.15 | ₹1,74,904.44 |
| 8 | Supply Of Stone | 471.25 | cum | 903 | ₹4,25,538.75 |
| 9 | Supplying and Laying of Wire Crates of Size 6.0 m x 1.20 m x 1.20 m, Having Mesh Size 100 mm x 100 mm Thickness of Wire is 4 mm Dia including all Lifts and Carriage to site. | 52 | nos | 6,200 | ₹3,22,400 |
| 10 | Sand avg10 km lead by MT | 55.23 | cum | 279.04 | ₹15,411.38 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_1109271.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .