| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.9 L+₹29,111 (5.23%)Rejected-AOC KAMARAJAR STREET KALATHUPOTTAL THATHANERI MADURAI 625018 | MADURAI | TAMIL NADU | 625018 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MAAG ELECTRICAL SOLUTION L1 | GOPAL ELECTRICAL WORKS L2 |
|---|---|---|---|---|---|
| 1.01 | Valluvar Colony Pumping 7Hp Repairing Valluvar Drainage Pumping Station 7Hp Submersible Motor in Well .Lifting 7 Hp Submersible Using Chain block then Dismantling of Motor Pump and motor Rotor , Stator and oil Chamber, Impeller ,Oil Seal Body, Bottom Cell Body. | 1 | Job | 5,000 ₹5,000 Lowest | 5,100 ₹5,100 |
| 2.01 | 7 HP Motor Stator Coil Complete Insulation Varnish Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Heater Replacement and 6 Nos Copper Legs Supply and Gripping. | 1 | Job | 1,900 ₹1,900 Lowest | 1,950 ₹1,950 |
| 3.01 | Motor Top Side Rubber Sealed Ball Bearing 1 nos, a Bottom Metal Double row Angular Ball Bearing 1 no Over all 2 No’s Bearing Supply, High Temp Petroleum Bearing Grease Supply and Fixing. | 1 | Set | 6,500 ₹6,500 Lowest | 6,600 ₹6,600 |
| 4.01 | Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no. | 1 | No | 9,400 ₹9,400 Lowest | 9,500 ₹9,500 |
| 5.01 | Motor Bottom Side Diaphragm Fixed Silicon Metal Oil Seal 1 no Supply. | 1 | No | 12,400 ₹12,400 Lowest | 12,500 ₹12,500 |
| 6.01 | Replacement Pump Side Oil Chamber 100/120 Grade oil | 1 | ltr | 140 ₹140 Lowest | 140 ₹140 Lowest |
| 7.01 | Motor Terminal Block replacement and fixing | 1 | No | 450 ₹450 Lowest | 480 ₹480 |
| 8.01 | Replacement of Motor and Pump Side “O” Rings | 1 | set | 900 ₹900 Lowest | 900 ₹900 Lowest |
| 9.01 | .Motor and pump Profile Gasket | 1 | no | 550 ₹550 Lowest | 550 ₹550 Lowest |
| 10.01 | Replacement of Pump Impeller S.S Nut | 1 | No | 250 ₹250 Lowest | 250 ₹250 Lowest |
Tender Value
₹5.7 L
EMD Value
₹5,741
Closing Date
8 Aug 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Madurai Corporation valluvar colony 7hp,10hp,5hp sekkilar pumping 20hp unit I and unit II kodal puthur 15hp 6nos non clog drainage submersible pump repairing zone1
2025_MAWS_587855_1
E4/EST- 144 / 24-25
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,741
29 Sept 2025
1 Aug 2025
8 Aug 2025
1 Aug 2025
8 Aug 2025
1 Aug 2025
Amount
Valluvar Colony Pumping 7Hp Repairing Valluvar Drainage Pumping Station 7Hp Submersible Motor in Well .Lifting 7 Hp Submersible Using Chain block then Dismantling of Motor Pump and motor Rotor , Stator and oil Chamber, Impeller ,Oil Seal Body, Bottom Cell Body.
7 HP Motor Stator Coil Complete Insulation Varnish Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Heater Replacement and 6 Nos Copper Legs Supply and Gripping.
Motor Top Side Rubber Sealed Ball Bearing 1 nos, a Bottom Metal Double row Angular Ball Bearing 1 no Over all 2 No’s Bearing Supply, High Temp Petroleum Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottom Side Diaphragm Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement Pump Side Oil Chamber 100/120 Grade oil
Motor Terminal Block replacement and fixing
Replacement of Motor and Pump Side “O” Rings
.Motor and pump Profile Gasket
Replacement of Pump Impeller S.S Nut
Dynamic Balancing of Shaft With Impeller
Supply And Fixing. Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell, Pump Impeller Rotor ,Oil Chamber Body Fixing Pump Body Bottom Cell. And Top Cover Cable Body Fixing Motor and Pump assembling, New Alan screws and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chain block and Testing
Valluvar Colony Drainage Pumping Station 10Hp Submersible Motor in Well .Lifting 10 Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
10 HP Motor Stator Coil Complete Burnout. Removing Complete Start or coil. then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tape ,Insulation Varnish Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 No’s Copper Legs Supply and Gripping.
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply, High Temp Petroleum Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement Pump Side Oil Chamber 100/120 Grade oil
Motor Teriminal Block replacement and fixing
Replacement of Motor and Pump Side “O” Rings
.Motor and pump Profile Gasket
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor BodyCell,PumpImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing
Sekillar Drainage Pumping Station 5Hp Submersible Motor in Well .Lifting 80Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
5HP Motor Stator Coil Complete Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Heater Replacement and 6 Nos Copper Legs Supply and Gripping.
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply,HighTempPetrolium Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Isolation of well & Dewatering Well With Safety Measure
Replacement Pump Side Oil Chamber 100/120 Grade oil .
Replacement of Motor SS Shaft
Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell, Pump Impeller Rotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover Cable Body Fixing Motor and Pump assembling, New Alan scrows and Spring Washer , Painting and Erection in Well Loading &Unloading Charge Using chain Block and Testing.
Sekillar Pumping Drainage Pumping Station 20Hp Submersible Motor in Well .Lifting 20Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
20HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Legs Supply and Gripping.
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply,High TempPetrolium Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement Pump Side Oil Chamber 100/120 Grade oil
Motor Teriminal Block replacement and fixing
Replacement of Motor and Pump Side “O” Rings
Dyanamic Balancing of pump shaft Impeller
.Motor and pump Profile Gasket
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor BodyCell,PumpImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing
Sekillar Pumping Drainage Pumping Station 20Hp Submersible Motor in Well .Lifting 20Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
20HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Legs Supply and Gripping.
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply, High TempPetrolium Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement Pump Side Oil Chamber 100/120 Grade oil
Motor Teriminal Block replacement and fixing
Replacement of Motor and Pump Side “O” Rings
Dyanamic Balancing of pump shaft Impeller
Replacement of Panel OLR
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor BodyCell,PumpImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing
Sekillar Pumping Drainage Pumping Station 15Hp Submersible Motor in Well .Lifting 15Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
15HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Legs Supply and Gripping.
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply,1kg High TempPetrolium Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottom Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement Pump Side Oil Chamber 100/120 Grade oil
Motor Terminal Block replacement and fixing
Replacement of Motor and Pump Side “O” Rings
Dynamic Balancing of pump shaft Impeller
Isolation of well & Dewatering well with Safety Measure
.Motor and pump Profile Gasket
Replacement of Panel OLR
Replacement of Timmer
Supply And Fixing. Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell, Pump Impeller Rotor ,Oil Chamber Body Fixing Pump Body Bottom Cell. And Top Cover Cable Body Fixing Motor and Pump assembling, New Alan screws and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chain block and Testing
Add GST 18%
GOPAL ELECTRICAL WORKS (BID ID -1420323)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .