Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
22 Jun 2026, 6:00 pm5d left
Er Karanjeet Singh
Executive Engineer PWD RandB Division Gandhi Nagar Jammu
Please refer to BOQ
2026_PWDJK_312549_1
Short e-NIT No. DGN/31 of 2026-27 Dated 15-06-2026
Open Tender
Civil Works
30 days
Shamshan Ghat to Ritiz Hotel Jammu
Please refer to e-NIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division Gandhi Nagar
₹80,000
Jammu
15 Jun 2026
15 Jun 2026
23 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 250 | Sqm | 153 | ₹38,250 |
| 2 | Providing & laying water bound macadam with specified stone aggregate screening and binding material including screening, sorting to template and consolidation with power road roller 80-100 KN capacity. Base course with 63mm – 45mm size including screening 13.20mm size in two layers of 75mm thick (consolidated) each. | 37.5 | Cum | 2,237.2 | ₹83,895 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 75 | Cum | 1,885.95 | ₹1,41,446.25 |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade–VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On WBM @ 0.75 Kg/sqm. | 1,000 | Sqm | 75.75 | ₹75,750 |
| 5 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 50 | Cum | 8,734.85 | ₹4,36,742.5 |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade–VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm. | 7,970 | Sqm | 56.1 | ₹4,47,117 |
| 7 | Providing and laying sgmi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equip⁰ed with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 2,100 | Sqm | 298.5 | ₹6,26,850 |
| 8 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.30mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity (including all leads, lifts and carriage complete). | 5,870 | Sqm | 358.2 | ₹21,02,634 |
| 9 | Engaging labour as per requirement at site. | 28 | Nos. | 553 | ₹15,484 |
| 10 | Engaging tractor with trolley for disposal of mulba, unhygenic material away from site as per direction of Engineer-in-charge. | 10 | Trip | 700 | ₹7,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1011714.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid