Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹52.3 L+₹2.5 L (5.08%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹65.9 L+₹16.1 L (32.4%)Accepted-Finance | L3 | Accepted-Finance Accepted |
Tender Value
₹50.1 L
EMD Value
₹60,000
Closing Date
1 May 2024, 5:00 pmClosed
se edc
sonbhadra
Electrification Work
2024_PVVNV_911642_1
136/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹60,000
29 May 2024
6 Mar 2024
2 May 2024
6 Mar 2024
1 May 2024
6 Mar 2024
Centralized Materials of following materials as per RESSPO/PuVVNL norms at the work site provided by Store Centar Robertsganj
ST Pole 11 Mtr. Long
Top Channel MS 100x50x2240 mm Long
M.S. Channel 125x65x1300 mm (T-off)
M.S.Channel Dropper100x50x6mm 2028mm Long
PCC Pole 8.5mtr long
250 KVA T/F 11/.4KV
X Arm M. S. Angle V-Type
11K.V. Disc Insulator T&C Type 4500Kg. With Fitting
11K.V.Pin Insulator With pin
A.C.S.R Weasel Conductor
Stay Complete
Earthing Complete
100 KVA T/F 11/.4KV
LT AB Cable ( 1x120+1x95 +1X16)
SS Base angle
Decenterlized Material Provided by Contractor
3 PH Distribution box
Suspension clamp for LT with I hook
Dead end clamp for LT with I hook
Piercinig cable connector of size 120 sqmm
1x35 sq.mm Cable for energisation of D.B
LT Clamp With Nut & Bolt
Danger Board With Nut & Botlts
Stone Pade (300x300x75)mm
Barbed Wire
Top ,T- Off & Dropper clamp With Nut & Bolt
F Bracket
Nut & Bolt with washer
E clamp
Copper L piece 50x225x10 mm
250 sq mm Al Lugs
3 Phase LT Distribution Boxes Including Clamps Nut & Bolts
P.G. Clamp For Conducter With Nut & Bolt
Work of following material as per Respo/Puvvnl norms at the work site.
Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & CROSS BRACING ANGLE & other required works with by jumpering with E bracket & Pin Insulator.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Erection of Gaurding and Fencing of 11/4 Kv S/S
Tree Cutting
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL Conductor, binding with insulators & jumpering.
Stringing & sagging of by LT AB Cable(1X120 + 1x95 + 1x16 ) by using suspension clamp for LT with I hook ,dead end clamp for LT with I hook and Piercing cable conductor of size 120 sqmm .
INSTALATION OF 3 Phase Distribution Box And Connecting by 1x35 sqmm Cable .
INSTALATION OF 250 KVA T/F on Plinth with Copper L Piece and AL Lug on Double Pole Structure.
INSTALATION OF 100KVA T/F on S/S Base with Copper L Piece and AL Lug on Double Pole Structure.
INSTALATION OF Danger Board with Nut Bolt.
INSTALATION OF Barbed Wire On Pole.
INSTALATION OF 3 Phase LT Distribution Box .
INSTALATION OF Chemical Earthing For T/F.
Making of Plinth For Size 2x2x1.5 M
M/S D.K. CONSTRUCTION
KRIPA ELECTRICAL WORKS AND SUPPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .