| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC AOC |
| 2 | L2₹3.8 L+₹22,224.65 (6.27%)Rejected-Finance | ₹3.8 L+₹22,224.65 (6.27%) | L2 | Rejected-Finance Quoted high value |
| 3 | L3₹3.9 L+₹32,894 (9.28%)Rejected-Finance | ₹3.9 L+₹32,894 (9.28%) | L3 | Rejected-Finance Quoted high value |
| 4 | L4₹4.2 L+₹62,745.69 (17.7%)Rejected-Finance | ₹4.2 L+₹62,745.69 (17.7%) | L4 | Rejected-Finance Quoted high value |
| 5 | L5₹4.4 L+₹81,235.22 (22.9%)Rejected-Finance | ₹4.4 L+₹81,235.22 (22.9%) | L5 | Rejected-Finance Quoted high value |
| Sl No | Description | Qty | Unit | S.P.K.CONSTRUCTIONSS L1 | RUPDEP PROJECTS CONSULTANTS PVT LTD L5 | Gees Epc Services Pvt. Ltd. L3 | MURTHY E V L2 | HOME TOME L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | SDR (Not requiring blasting) Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in soft disintegrated rock, soft rock, laterite or Kankar not requiring blasting (item No W-0062) | 94.5 | M3 | 206 ₹19,467 | 248 ₹23,436 | 300 ₹28,350 | 371 ₹35,059.5 | 176.44 ₹16,673.58 Lowest |
| 2.00 | Supplying and filling in foundation and basement with filling M-sand in layers of not more than15cm. thick well rammed watered and compacted etc., complete complying with standard specificationerial and all labour charges etc.complete | 14 | M3 | 1,810 ₹25,340 | 2,070 ₹28,980 | 2,100 ₹29,400 | 1,740 ₹24,360 | 1,726.82 ₹24,175.48 Lowest |
| 3.00 | C.C.(1:4:8) using 40 mm HBG metai concrete mixture for all works including cost and conveyance of all material and all labour charges etc.complete | 14 | M3 | 5,565 ₹77,910 | 6,900 ₹96,600 | 6,000 ₹84,000 | 5,335 ₹74,690 | 5,250.96 ₹73,513.44 Lowest |
| 4.00 | Supplying and laying of Interlocking Paver Block Stone 60mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 140 | M2 | 1,000 ₹1,40,000 | 1,104 ₹1,54,560 | 950 ₹1,33,000 Lowest | 970 ₹1,35,800 | 1,458.49 ₹2,04,188.6 |
| 5.00 | Supplying of linch UPVC Pipe | 100 | RM | 148 ₹14,800 | 97 ₹9,700 | 125 ₹12,500 | 83 ₹8,300 Lowest | 107.4 ₹10,740 |
| 6.00 | Supplying of 1inch UPVC Coupler | 25 | Nos. | 33 ₹825 | 83 ₹2,075 | 25 ₹625 Lowest | 32 ₹800 | 32.7 ₹817.5 |
| 7.00 | Supplying of linch UPVC Elbow | 15 | Nos. | 30 ₹450 | 83 ₹1,245 | 35 ₹525 | 28 ₹420 Lowest | 29.1 ₹436.5 |
| 8.00 | Supplying of linch UPVC TEE | 10 | Nos. | 39 ₹390 | 55 ₹550 | 40 ₹400 | 36 ₹360 Lowest | 38.5 ₹385 |
| 9.00 | Supplying of 1inch UPVC MTA | 5 | Nos. | 35 ₹175 | 69 ₹345 | 35 ₹175 | 28 ₹140 Lowest | 40.21 ₹201.05 |
| 10.00 | Supplying of linch Brass Valve | 1 | No. | 120 ₹120 Lowest | 1,518 ₹1,518 | 850 ₹850 | 2,080 ₹2,080 | 592 ₹592 |
Tender Value
₹3.8 L
EMD Value
₹3,900
Closing Date
10 Jul 2026, 3:00 pmClosed
Deputy Director
O/o Director Arignar Anna Zoological Park Vandalur
LAYING OF PAVER BLOCK IN DEPUTY DIRECTOR QUARTERS
2026_TNFD_682916_1
3897/2026/D
Open Tender
Civil Works
Works
Arignar Anna Zoological park
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3,900
4 Aug 2026
26 Jun 2026
11 Jul 2026
26 Jun 2026
10 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SDR (Not requiring blasting) Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in soft disintegrated rock, soft rock, laterite or Kankar not requiring blasting (item No W-0062) | 94.5 | M3 | 392.88 | ₹37,127.16 |
| 2 | Supplying and filling in foundation and basement with filling M-sand in layers of not more than15cm. thick well rammed watered and compacted etc., complete complying with standard specificationerial and all labour charges etc.complete | 14 | M3 | 1,838 | ₹25,732 |
| 3 | C.C.(1:4:8) using 40 mm HBG metai concrete mixture for all works including cost and conveyance of all material and all labour charges etc.complete | 14 | M3 | 5,646.87 | ₹79,056.18 |
| 4 | Supplying and laying of Interlocking Paver Block Stone 60mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 140 | M2 | 975.4 | ₹1,36,556 |
| 5 | Supplying of linch UPVC Pipe | 100 | RM | 88.8 | ₹8,880 |
| 6 | Supplying of 1inch UPVC Coupler | 25 | Nos. | 32.7 | ₹817.5 |
| 7 | Supplying of linch UPVC Elbow | 15 | Nos. | 29.1 | ₹436.5 |
| 8 | Supplying of linch UPVC TEE | 10 | Nos. | 38.5 | ₹385 |
| 9 | Supplying of 1inch UPVC MTA | 5 | Nos. | 30 | ₹150 |
| 10 | Supplying of linch Brass Valve | 1 | No. | 2,199 | ₹2,199 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
38972026DLayingPaverBlock.pdf
Tender Documents • 1.26 MB
BOQ_820955.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .