| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 LAccepted-AOC KANIYANUR PANCHAYAT | 1 | Accepted-AOC lowest amount quotted | |
| 2 | 2₹12.6 L+₹12,334.54 (0.99%)Rejected-AOC | 2 | Rejected-AOC higjhest amount quotted |
| Sl No | Description | Qty | Unit | SPR TRADERS L1 | M RAVIANAND L2 |
|---|---|---|---|---|---|
| 1.00Renewal the Road From Pindithangal road KM 0/0-1/0 R117 VPR | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 864 | Sqm | 6.36 ₹5,495 Lowest | 8 ₹6,912 |
| 1.02 | Collection and supply of gravel appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 108 | Sqm | 145 ₹15,660 Lowest | 152 ₹16,416 |
| 1.03 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 1.98 | Cum | 4,164.31 ₹8,245 Lowest | 4,164.31 ₹8,245 Lowest |
| 1.04 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 10.44 | Cum | 4,847.31 ₹50,606 Lowest | 4,847.31 ₹50,606 Lowest |
| 1.05 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 2,250 | Sqm | 34.32 ₹77,220 Lowest | 38 ₹85,500 |
| 1.06 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 67.5 | Cum | 11,325 ₹7,64,438 Lowest | 11,325 ₹7,64,438 Lowest |
| 1.07 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of | 120 | Sqm | 890 ₹1,06,800 Lowest | 890 ₹1,06,800 Lowest |
| 1.08 | 60 cm equilateral triangle | 4 | nos | 4,999 ₹19,996 Lowest | 4,999 ₹19,996 Lowest |
| 1.09 | Provision for Hectometer stone | 4 | nos | 570 ₹2,280 Lowest | 570 ₹2,280 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,600
Closing Date
12 Feb 2026, 3:00 pmClosed
Block developement officer
Block developement office thimiri
Renewal the Road From Pindithangal road KM 0/0-1/0 R117 VPR
2026_RDTN_651829_1
A3/4030/2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Block developement office thimiri
Renewal the Road From Pindithangal road KM 0/0-1/0 R117 VPR
2 documents required · 2 mandatory
₹0
₹12,600
Block developement office thimiri
23 Sept 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renewal the Road From Pindithangal road KM 0/0-1/0 R117 VPR | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 864 | Sqm | 6.36 | ₹5,495.04 |
| 1.02 | Collection and supply of gravel appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 108 | Sqm | 145.82 | ₹15,748.56 |
| 1.03 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 1.98 | Cum | 4,164.31 | ₹8,245.33 |
| 1.04 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 10.44 | Cum | 4,847.31 | ₹50,605.92 |
| 1.05 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 2,250 | Sqm | 34.32 | ₹77,220 |
| 1.06 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 67.5 | Cum | 11,325.75 | ₹7,64,488.13 |
| 1.07 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of | 120 | Sqm | 890 | ₹1,06,800 |
| 1.08 | 60 cm equilateral triangle | 4 | nos | 4,999 | ₹19,996 |
| 1.09 | Provision for Hectometer stone | 4 | nos | 574.65 | ₹2,298.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
pindithangaltdoc.pdf
Tender Documents • 0.44 MB
BOQ_781611.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .