Loading…
Loading…
Tender Value
₹32 L
EMD Value
₹3.2 L
Closing Date
22 Sept 2026, 12:00 pmDue today
EE PD PWD Bulandshahar
EE PD PWD Bulandshahar
Construction of rain water harvesting in Block-B of the DM Colony District Bulandshahr
2026_CEMRT_1184021_5
5730/1A Dt. 29.08.2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Bulandshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹3.2 L
Yes
EE PD PWD Bulandshahar
15 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
15 Sept 2026 - 16 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But excluding GST (For 8 Units) As Per DSR No 2.6.1 | 270 | Cum | 134 | ₹36,180 |
| 2 | Backfilling behind the abutment wall and return wall complete as per drawing and technical specification Clause 1204.3.8 Sr No. 12.10 Ref No. 1200.Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I. (For 8 Units)But excluding GST | 10.8 | Cum | 1,015 | ₹10,962 |
| 3 | Cement concrete with 4cm (1/2") gauge approved stone ballast, approved coarse sand, cement in the proportion 6:3:1 including supply of all materials,labour,T&P etc. required for proper completion of the work.Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.(For 8 Units)But excluding GSTAs per DSR 4.1.6 | 10.8 | Cum | 5,424 | ₹58,579.2 |
| 4 | Class-150 Brick work in 1:4 cement & fine sand of 1.25 FM mortar in foundation including necessary moulding & cutting of bricks as required including supply of all materials, labour and T&P etc. required for proper completion of the work thickness of wall of one brick thick Including all type of taxes,octroi,toll taxes,labour cess, cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But excluding GST.(For 8 Units)(As per DSR No - 6.4.1). | 108 | Cum | 7,060 | ₹7,62,480 |
| 5 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (M-15)Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.(For 8 Units)But excluding GST | 5.4 | Cum | 6,910 | ₹37,314 |
| 6 | 20 mm thick cement plaster in dedo or skirting in 1:2 consisting of one part and two part coarse sand laid in panels , finished with 3 mm floating coat of neat cement and marble dust in ratio 5:1 including suppy of materials, labours and T&P etc. required for proper completion of work.(For 8 Units) (As per DSR No - 14.1.2). | 660 | Sqm | 423 | ₹2,79,180 |
| 7 | Supplying, filling, spreading & levelling stone boulders of size range 5 cm to 20 cm, in the recharge pit in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.Including all type of taxes,octroi,toll taxes,labour cess,cost of all material, labour T&P etc required for proper completion of work as per Direction of E/I.(For 8 Units)But excluding GST | 13.2 | Cum | 2,321 | ₹30,637.2 |
| 8 | Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.(For 8 Units)But excluding GST. As DSR - 23.6 | 9.6 | Cum | 1,162 | ₹11,155.2 |
| 9 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (M-20)Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.(For 8 Units)But excluding GST | 15 | Cum | 7,800 | ₹1,17,000 |
| 10 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge.(For 8 Units) | 15 | Qtl | 7,090 | ₹1,06,350 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_2227115.xls
BOQ • 0.97 MB
T1.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .