| 1 | L1₹21.8 LAdmitted-Finance | -25.01% | ₹21.8 L | L1 | Admitted-Finance |
| 2 | L2₹25.0 L+₹3.2 L (14.8%)Admitted-Finance | -9.97% | ₹25.0 L+₹3.2 L (14.8%) | L2 | Admitted-Finance |
| 3 | L3₹30.4 L+₹8.6 L (39.7%)Admitted-Finance | -11.00% | ₹30.4 L+₹8.6 L (39.7%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S KAROL CONSTRUCTION COMPANY L2 | M/s Sardar Singh Contractor L3 | RAJKUMAR SOLANKI L1 |
|---|---|---|---|---|---|---|
| .01PART- B (Item Rate Basis) | ||||||
| 1.00 | Disposal of rubbish un-wanted material dismanted material away from site at appropirate place including all lead and lift, loading unloading, transportatoin labour etc. As per direction of Engineer in charges. | 160 | P.Cum | 490 ₹78,400 | 200 ₹32,000 Lowest | 570 ₹91,200 |
| 2.00 | Supply stacking and spreading of graded crusher brocken hard stone aggregate fee from organic matter including stacking & spreading in yard / trenches as per the standard specification of size 40mm to 63 mm incl. all lead & lift, transportation, labour, loading, unloading & T&P required for gravelling work as per direction if Engineer in charge incl. dressing & leveling. | 67 | P.Cum | 1,582 ₹1,05,994 | 2,000 ₹1,34,000 | 1,299 ₹87,033 Lowest |
| 3.00 | Re-arranging of cable loops of 33/11 KV i/c levelling of ground, for graveling and fencing work around transformer at various locations i/c shifting the cables using safety gears, gloves complete, Shifting work only to be done during shutdownand under the direction of E/1. | 40 | Each | 1,905 ₹76,200 | 15,000 ₹6,00,000 | 490 ₹19,600 Lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
24 Aug 2026, 3:00 pmClosed
SE CIVIL JVVNL
SE CIVIL JVVNL OPH, RAM MANDIR BANI PARK JAIPUR
Constrution of platform and fencing work at various distribution transformer under AEN (O and M) Kailadevi and Sapotara.
2026_JVVNL_591577_8
E-NIT 11/2026-27
Open Tender
Civil Works
Percentage
120 days
Kailadevi and Sapotara.
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
AO(O and M) JVVNL BTP Through NEFT/RTGS/IMPS/UPI
₹70,000
Yes
27 Aug 2026
21 Aug 2026
25 Aug 2026
21 Aug 2026
24 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A (Bldg.) | - | - | - | - |
| 1 | B-1.1
Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed:
All kinds of soil | 800 | P.sqm | 35 | ₹28,000 |
| 2 | B-1.8
E/W in excavation by mechanical means (hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5m in which or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering &ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils. | 49 | P.cum | 178 | ₹8,722 |
| 3 | B-3.1.6: Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
(A) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 7 | P.cum | 3,962 | ₹27,734 |
| 3.01 | B-3.1.1:
M20 grade Nominal Mix
1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 35 | P.cum | 5,898 | ₹2,06,430 |
| 4 | B-6.1.6
RR stone masonry for with hard stone in foundation and plinth in CSM above 30cm thick wall in CM 1:6 (1cement :6 Sand) | 52 | P.cum | 3,406 | ₹1,77,112 |
| 5 | 9.2
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: | 10,935 | P. Kg | 93 | ₹10,16,955 |
| 6 | B-9.38.3
Providing and fixing welded mesh/expanded metal mesh in frame work, flat iron beading 20x3mm including top cross laps inside and out sides welding, iron bolts, crews, clips etc. complete (excluding frame work) of size.
Welded mesh 25 mmx 25 mm x 2.1 mm | 872 | P.sqm | 825 | ₹7,19,400 |
| 7 | 12.46.1 /B-64
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:
(A) Two or more coats on new work. | 872 | P.sqm | 76 | ₹66,272 |
| 8 | 11.29
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand ) including making joints with without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete including painting etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineerin- charge). | 38 | P.cum | 6,103 | ₹2,31,914 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.11 MB
Tendernotice_2.pdf
PDF • 2.31 MB
BOQ_1050454.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .