Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance S A | Admitted-Finance |
Tender Value
₹47.4 L
EMD Value
₹48,500
Closing Date
13 Mar 2020, 3:00 pmClosed
The Project Director
The Project Director DRDA,Vellore
Renovation of 6 no of Ponds Ooranies,Kulam Kuttai in Kaveripakkam Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no-20
2020_RDTN_158265_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹48,500
11 Apr 2020
18 Feb 2020
13 Mar 2020
18 Feb 2020
13 Mar 2020
18 Feb 2020
Amount
1. Rejuvenation of Kalya Paarai Kulam at Karikkal Panchayat in Kaveripakkam block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Construction of Retaining wall for Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Construction of Bathing Ghat, Steps, outer platform
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Construction of steps over bund
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Construction of inlet channel structure
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Above GL
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
2. Rejuvenation of Mottur Kulam at Mottur in Soorai Panchayat in Kaveripakkam block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Random Rubble Masonry in cm 1:5mix with simultaneous pointingincluding cost and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
3. Rejuvenation of Padavettamman Kulam at Sooraikulam in Kilveeranam Panchayat in Kaveripakkam block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Random Rubble Masonry in cm 1:5mix with simultaneous pointingincluding cost and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
4. Rejuvenation of EswaranKulam at Kunnathur in Kunnathur Panchayat in Kaveripakkam block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
5. Rejuvenation of Kariyan Kulam at Maganipattu Panchayat in Kaveripakkam block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Construction of Retaining wall for Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Construction of Bathing Ghat, Steps, outer platform
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Construction of steps over bund
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Construction of inlet channel structure
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Above GL
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc
6. Rejuvenation of Eswaran Kulam at Mangalam Panchayat in Kaveripakkam block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Random Rubble Masonry in cm 1:5mix with simultaneous pointingincluding cost and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:4, 20mm thickness including cost and conveyance and all albour charges etc.,
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
S A Srinivasan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .