Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance Reject |
Tender Value
₹1.2 Cr
EMD Value
₹62,453
Closing Date
20 Jul 2026, 5:30 pmClosed
Praveen Dixit
Gwalior Municipal Corporation
Survey and Design of Laying of Sewer Network in place of under size sewerage network in Ward 52 at Guda puliya to bilgaiyon ka pura (12 Beegha). 2nd Call
2026_UAD_514734_2
MPGMC/84/26X9/1/PHE/2026-27
Open Tender
Miscellaneous Works
Percentage
180 days
PHE Department
Please refer Tender documents.
5 documents required · 5 mandatory
₹12,500
₹62,453
6 Aug 2026
3 Jul 2026
22 Jul 2026
4 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth. ) including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed All kinds of ordinary soil.
0 to 1.5m | - | cum | - | - |
| 2 | 1.5m to 3m | - | cum | 1 | - |
| 3 | 3m to4.5 | - | cum | 1 | - |
| 4 | Ordinary rock
0 to 1.5m | - | cum | - | - |
| 5 | 1.5m to 3m | - | cum | 1 | - |
| 6 | In or under water and/or liquid mud, including pumping out water as required. (All water that may accumulate in excavations during the progress of the work from seepage, (not due to the negligence of the contractor), shall be bailed, pumped out or otherwise removed. The contractor shall take adequate measures for bailing and/or pumping out water from excavations and / or pumping out water from excavations and construct diversion channels, bunds, sumps, etc)
Muddy soil
0 to 1.5m | - | cum | 1 | - |
| 7 | 1.5m to 3m | - | cum | 1 | - |
| 8 | In or under foul position, including pumping out water as required . (Excavation, where sewage, sewage gases or foul conditions are met with from any source, shall fall in this category. Decision of the. Engineer-in-Charge whether the work is in foul position or not shall be final.) Foul position
0 to 1.5m | - | cum | 1 | - |
| 9 | 1.5m to 3m | - | cum | 1 | - |
| 10 | Filling by available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming
and watering, lead up to 50 m and lift upto 1.5 m. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.15 MB
TenderDocument.pdf
Tender Documents • 2.94 MB
NIT84.pdf
Other Document • 2.31 MB
Envelope-B.pdf
Other Document • 0.16 MB
Envelope-A.pdf
Other Document • 0.31 MB
BOQ_625327.xls
BOQ • 0.28 MB
Estimate.pdf
Additional Documents • 4.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].