Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-Finance | ₹13.9 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹14.0 L+₹6,000 (0.43%)Rejected-Finance ROOM NO 608 BLDG NO 06 R B T CO OP HSG SOC NEW CHIKUWADI MANKHURD W MUMBAI 400043 | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹14.0 L+₹6,000 (0.43%) | L2 | Rejected-Finance Being L2 |
| Sl No | Description | Qty | Unit | Jayesh Prakash Sawant L1 | B L WAGHMARE BABA AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00Desilting of deposited silt by excavating from the stalling ponds & drains, canals, etc. at various locations and sizes and depth upto 3m below ground level including removing of wild vegetations, creepers, if any by the side of ponds as per the directions of Project Engineer. | |||||
| 1.10 | Open RCC canals, drains inside and outside fencing | 50 | CuM | 300 ₹15,000 Lowest | 300 ₹15,000 Lowest |
| 2.00Lead charges for removal of soil deposited from stalling ponds and other areas of BARC by mechanical transport for lead or mentioned below including loading, unloading , stacking, levelling etc. | |||||
| 2.10 | Lead for 1st 1Km or part thereof .Note: The rate for above item is applicable for the net quantity arrived at after making deductions for voids @ 20% in respect of Soil and 30 % in respect of debries, from the truck measurement for payment . | 40 | CuM | 250 ₹10,000 Lowest | 300 ₹12,000 |
| 3.00 | Removing / Breaking big boulders of landslide by chieselling from road/ RCC canals, open rubble pitched canal and transporting the same with mechanical transport for lead exceeding 2 Km but not exceeding 3 Km including loading, unloading stacking and levelling. Note: The rates in respect of above item is applicable for the NET Quantities arrived at after making deductions for voids 50% from the corresponding Stack / truck measurement for payment. | 3 | CuM | 1,000 ₹3,000 Lowest | 3,000 ₹9,000 |
| 4.00Removing of silt, dry leaves, murrum, small Boulders etc. completely from the bed of open nallah, drains, open rubble pitched drains, canals & disposing the removed earth within a lead of 50 mtr during monsoon period. The rates are including removing of green wild creepers etc. silt thickness upto 100 mm thick and upto 3.00 M depth. | |||||
| 4.10 | 230 to 749 mm wide at bottom | 1,250 | M | 50 ₹62,500 | 35 ₹43,750 Lowest |
| 4.20 | 750 to 2000 mm wide at bottom | 1,350 | M | 50 ₹67,500 | 45 ₹60,750 Lowest |
| 4.30 | Above 2000 to 3000 mm wide at bottom | 100 | M | 50 ₹5,000 Lowest | 145 ₹14,500 |
| 5.00 | Cleaning of existing storm water chamber of varying depth at various locations by removing the silt, leaves, small stones, earth etc. within a lead of 50 mtr during monsoon period including labour required for removing and replacing C.I Covers at storm water chamber (Max. plan area of up to 1 SqM.). | 80 | Each | 400 ₹32,000 | 200 ₹16,000 Lowest |
Tender Value
₹12.8 L
EMD Value
₹30,279
Closing Date
16 Jul 2026, 3:00 pmClosed
Project Engineer
CED, BARC, Trombay, Mumbai
Cleaning of open RCC canals, box culverts, arch. culverts, rubble pitched drains, terrace cleaning of hill side area at North site, BARC, Trombay, Mumbai,Year-2026-2027.
2026_BARC_908621_1
BARC/CED/ET/10/2026-2027 Dated 13/05/2026
Open Tender
Civil Works
Item Rate
730 days
Hill side area at North site, BARC, Trombay, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹30,279
16 Sept 2026
15 May 2026
20 Jul 2026
15 May 2026
16 Jul 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Desilting of deposited silt by excavating from the stalling ponds & drains, canals, etc. at various locations and sizes and depth upto 3m below ground level including removing of wild vegetations, creepers, if any by the side of ponds as per the directions of Project Engineer. | |||||
| 1.1 | Open RCC canals, drains inside and outside fencing | 50 | CuM | - | - |
| 2Lead charges for removal of soil deposited from stalling ponds and other areas of BARC by mechanical transport for lead or mentioned below including loading, unloading , stacking, levelling etc. | |||||
| 2.1 | Lead for 1st 1Km or part thereof .Note: The rate for above item is applicable for the net quantity arrived at after making deductions for voids @ 20% in respect of Soil and 30 % in respect of debries, from the truck measurement for payment . | 40 | CuM | - | - |
| 3 | Removing / Breaking big boulders of landslide by chieselling from road/ RCC canals, open rubble pitched canal and transporting the same with mechanical transport for lead exceeding 2 Km but not exceeding 3 Km including loading, unloading stacking and levelling. Note: The rates in respect of above item is applicable for the NET Quantities arrived at after making deductions for voids 50% from the corresponding Stack / truck measurement for payment. | 3 | CuM | - | - |
| 4Removing of silt, dry leaves, murrum, small Boulders etc. completely from the bed of open nallah, drains, open rubble pitched drains, canals & disposing the removed earth within a lead of 50 mtr during monsoon period. The rates are including removing of green wild creepers etc. silt thickness upto 100 mm thick and upto 3.00 M depth. | |||||
| 4.1 | 230 to 749 mm wide at bottom | 1,250 | M | - | - |
| 4.2 | 750 to 2000 mm wide at bottom | 1,350 | M | - | - |
| 4.3 | Above 2000 to 3000 mm wide at bottom | 100 | M | - | - |
| 5 | Cleaning of existing storm water chamber of varying depth at various locations by removing the silt, leaves, small stones, earth etc. within a lead of 50 mtr during monsoon period including labour required for removing and replacing C.I Covers at storm water chamber (Max. plan area of up to 1 SqM.). | 80 | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.71 MB
Tendernotice_2.pdf
PDF • 1.21 MB
ProformaofScheduleET10.pdf
Tender Documents • 0.27 MB
ScheduleAET10.pdf
Tender Documents • 0.22 MB
TechnicalbidET10.xls
Tender Documents • 0.07 MB
BOQ_954974.xls
BOQ • 0.24 MB
eCorrigendumNo4CED10.pdf
PDF • 0.24 MB
eCorrigendumNo3ET10.pdf
PDF • 0.24 MB
eCorrigendumNo2ET10.pdf
PDF • 0.26 MB
eCorrigendumNo1ET10.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .