Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹22.6 L+₹3,233.50 (0.14%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹22.6 L+₹3,556.84 (0.16%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹22.6 L+₹3,556.84 (0.16%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L3₹22.6 L+₹3,556.84 (0.16%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32.3 L
EMD Value
₹32,400
Closing Date
16 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
O/o the SE, M.I. Division, Malkangiri
Improvement to MI Tank at MV-79/80 in Kalimela Block of Malkangiri District under Critical Grant for the year 2026-27.
2026_CEMIB_144800_1
SEMIDMKG-08/26-27
Open Tender
Civil Works - Water Works
Percentage
90 days
MV79/80
Refer DTCN
2 documents required · 2 mandatory
₹6,000
₹32,400
Yes
21 Nov 2026
2 Nov 2026
17 Nov 2026
2 Nov 2026
16 Nov 2026
2 Nov 2026
2 Nov 2026 - 14 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation to proper profile in hard or gravelly soil with all leads and lifts including dressing and leveling the bed to proper slope and level making it fit for laying concrete including depositing the excavated materials clear of work site with initial lead and lift of 50m & initial lift of 1.5m including dewatering from foundation if necessary complete as directed by the Engineer-in-charge. | 281.15 | 100 Cum | 28,648.2 | ₹80,54,441.43 |
| 2 | Filling foundation and plinth with sand of approved quality well watered and rammed including cost, conveyance, royality and all other taxes of materials supplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-In-charge. | 34.88 | 1 Cum | 608.1 | ₹21,210.53 |
| 3 | Cement Concrete M15 grade with 20mm and down graded hard granite crusher broken chips of approved quality free from weathered skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level, compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period with cost,conveyance,hire and running charges of all machineries,royalty and other taxes of all materials supplying all labour,T&P materials required for this item (Excluding cost of reinforcement if provided) etc. complete in all respect as directed by the Engineer-in-Charge. | 17.44 | 1 Cum | 5,454.1 | ₹95,119.5 |
| 4 | Cement Concrete M20 grade with 20mm and down graded hard granite crusher broken chips of approved quality free from weathered skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level, compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period with cost,conveyance,hire and running charges of all machineries, royalty and other taxes of all materials supplying all labour,T&P materisls required for this item (Excluding cost of reinforcement if provided) etc. complete in all respect as directed by the Engineer-in-Charge. | 254.61 | 1 Cum | 5,940.7 | ₹15,12,561.63 |
| 5 | Supplying, Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost,conveyance and all other taxes of reinforcement supplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. | 70.39 | 1 Qntl | 9,307.3 | ₹6,55,178.08 |
| 6 | Providing rigid and smooth shuttering with box type steel shuttering plates with keys for intermediate Construction Joints for C.C/R.C.C work and dismantling them after casting with all cost conveyance of materials supplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. | 1,006.05 | 1 sqm | 305.8 | ₹3,07,650.09 |
| 7 | Rough stone dry packing in approns and revetments to all heights with hard granite stone with size 30 cm and above of approved quality quarried and free from weathered skin including filling interstices with small stones with cost, conveyance, royalty and other taxes of all materials required for the work and finished to proper slope and level supplying all labour and T&P required for the work etc complete in all respect as directed by the Engineer-in-Charge. | 59.38 | 1 Cum | 2,085.4 | ₹1,23,831.05 |
| 8 | Filling in foundation and plinth with excavated earth including watering and ramming supplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. | 54.06 | 100 Cum | 19,098.8 | ₹10,32,481.13 |
| 9 | Earth work in hard soil or gravelly soil with all leads & lifts including rough dressing and breaking clouds to maximum 5 cm to 7cm and laying in layers not exceeding 0.30m in depth supplying all labour and T&P materials required for the work etc. complete in all respect as directed by the Engineer in charge. | 677.48 | 100 Cum | 27,482.3 | ₹1,86,18,708.6 |
| 10 | Providing and speading moorum and consolidation with HRR including watering, cost of moorum and conveyance of moorum etc completed supplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. | 170.82 | 1 Cum | 1,410.2 | ₹2,40,890.36 |
stage.html
html • 0.03 MB
finance_617114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
1.pdf
Tender Documents • 3.70 MB
BOQ_617114.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .